Bulk ore sorting cut-off estimation methodology: Phu Kham Mine case study

被引:7
|
作者
Reple, A. [1 ,2 ]
Chieregati, A. C. [1 ]
Valery, W. [3 ,4 ]
Prati, F. [2 ]
机构
[1] Univ Sao Paulo, Av Prof Mello Moraes 2373, Sao Paulo, SP, Brazil
[2] Consultoria Mineracao & Meio Ambiente Ltda, Kalium Consultoria, Rua Purpurina,131 Cj 138, Sao Paulo, SP, Brazil
[3] Hatch, 61 Petrie Tce, Brisbane, Qld 4000, Australia
[4] Univ Queensland, St Lucia, Qld 4072, Australia
关键词
Bulk ore sorting; Cut-off grade; Phu Kham Mine; Copper; Geostatistics;
D O I
10.1016/j.mineng.2018.08.006
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
As part of the evolution of ore sorting technology for large-scale production operations, Bulk Ore Sorting (BOS) is applied to projects that mine tens of millions of tons per year. BOS systems aim to remove as much non-economic material as possible prior to milling. Mass recovery, metallurgical recovery and consequently plant throughput fluctuate according to deposit characteristics, mining method, equipment efficiency and the cut-off grade applied at both the mine and BOS stage. This case study presents a calculation methodology which determines cut-off grade combinations for the mine and BOS to maximize the financial return for both brownfield and greenfield projects. From this information it is possible to calculate the mass balance, including the BOS stage, in a new process flow sheet. The assumptions made, and production data used (such as volumes, costs and grades) for this case study were those realized in 2014 by Phu Kham Mining, a world-class copper and gold operation situated in Laos.
引用
收藏
页数:4
相关论文
共 45 条
  • [1] Quantitative estimation of dilution and ore loss resulting from block estimation errors and a specified cut-off grade
    Postolski, TA
    Sinclair, AJ
    EXPLORATION AND MINING GEOLOGY, 1998, 7 (1-2): : 91 - 98
  • [2] Optimization of reservoir cut-off parameters: a case study in SW Iran
    Mahbaz, SeyedBijan
    Sardar, Hadi
    Namjouyan, Mehdi
    Mirzaahmadian, Yaser
    PETROLEUM GEOSCIENCE, 2011, 17 (04) : 355 - 363
  • [3] Cut-off wall construction using Cutter Soil Mixing: a case study
    Arnold, Michael
    Beckhaus, Karsten
    Wiedenmann, Ulli
    GEOTECHNIK, 2011, 34 (01) : 11 - 21
  • [4] Optimizing cut-off grade considering grade estimation uncertainty - A case study of Witwatersrand gold-producing areas
    Birch, C. C.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2022, 122 (07) : 337 - 346
  • [5] Cut-off low pressure systems over southern Australia: Climatology and case study
    Qi, L
    Leslie, LM
    Zhao, SX
    INTERNATIONAL JOURNAL OF CLIMATOLOGY, 1999, 19 (15) : 1633 - 1649
  • [6] Groundwater impact of open cut coal mine and an assessment methodology: A case study in NSW
    Zhao Liang
    Ting Ren
    Wang Ningbo
    INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2017, 27 (05) : 861 - 866
  • [7] Groundwater impact of open cut coal mine and an assessment methodology: A case study in NSW
    Zhao Liang
    Ting Ren
    Wang Ningbo
    InternationalJournalofMiningScienceandTechnology, 2017, 27 (05) : 861 - 866
  • [8] Performance of cut-off walls under long-term vacuum suction: A case study
    Xu, Chenchen
    Hu, Yongtao
    Han, Shijie
    Geng, Xueyu
    Cheng, Da
    He, Ning
    Deng, Yongfeng
    MARINE GEORESOURCES & GEOTECHNOLOGY, 2025, 43 (04) : 655 - 664
  • [9] Comparison of golden section search method and imperialist competitive algorithm for optimization cut-off grade-case study: Mine No. 1 of Golgohar
    Mohammadi, S.
    Ataei, M.
    Kakaie, R.
    Pourzamani, E.
    JOURNAL OF MINING AND ENVIRONMENT, 2015, 6 (01): : 63 - 71
  • [10] Study on the Influence of Water Level on Earth Dam Reinforced by Cut-Off Wall: A Case Study in Wujing Reservoir
    Liu, Da
    Lin, Taiqing
    Gao, Jianglin
    Xue, Binghan
    Yang, Jianhua
    Chen, Congxin
    Zhang, Weipeng
    Sun, Wenbin
    WATER, 2023, 15 (01)