Tunnelling undercrossing existing live MRT tunnels

被引:21
|
作者
Sheng, Esen Sze Yu [1 ]
Chuan, Jim Yee Tung [2 ]
Ikhyung, Henry Kim [3 ]
Osborne, Nick H. [4 ]
Boon, Chang Kin [1 ]
Siew, Richard [2 ]
机构
[1] Land Transport Author, Singapore, Singapore
[2] CDM Smith Inc, Singapore, Singapore
[3] GS Engn & Construct, Singapore, Singapore
[4] Mott Macdonald, Singapore, Singapore
关键词
Tunnelling; Undercrossing; Stakeholders; MRT;
D O I
10.1016/j.tust.2016.02.013
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In conjunction with the government of Singapore's vision to have efficient and extensive Mass Rapid Transit (MRT) system across Singapore Island, more and more rail tunnels are planned to be constructed in close proximity to sensitive buildings and infrastructures in recent years. This being a particular challenge for major infrastructure works in the urban environment. In contract C937 of Downtown Line Stage 3 (DTL3), twin bored tunnels connect Fort Canning station to Bencoolen Station, under Fort Canning Hill, with the alignment overcrossing the existing North East Line (NEL) rail tunnel, undercrossing North South Line (NSL) and Circle Line (CCL) with clear distance of less than one bored tunnel diameter. This inevitably poses great challenges to tunnelling over and under existing live tunnels without disruption to daily operation of MRT. Further compounding the challenge is the ground condition comprising of Jurong Formation steeply variable sedimentary deposits transitioning into Fort Canning Boulder Bed a colluvial deposit of quartzite boulders in a stiff clay matrix. To successfully negotiate this challenge, requires all involved parties to make contributions in their areas of expertise and work as team together to ensure that the works progress smoothly and as planned. The designer provides an overall approach demonstrating that the work can be safely carried out and provides key parameters for the contractor who carries out the tunnelling with construction control, which in turn is supervised by the supervision engineers ensuring work is carried out safely. The client, who provides the vision in the first place, has overall responsibility for the work providing continuity and ensuring that the component parts of the job are co-ordinated and carried out successfully. In addition, different monitoring levels were also established to reduce the train speed if necessary and also bus bridging service as a contingency measure. This paper summarizes the approach to the tunnelling, key tunnelling parameters during undercrossing of existing live MRT tunnels, instrumentation monitoring as well as measured railway track and structure movements due to proximity tunnelling. It reflects upon the on crucial contributory factors that ensure success within the project and serves as a reference as to how engineering boundaries can be challenged underground. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:241 / 256
页数:16
相关论文
共 50 条
  • [21] Model test for effects of construction of shield tunnelling in overlapping tunnels on existing tunnel
    Xie, X. (xiexiongyao@tongji.edu.cn), 1600, Academia Sinica (32):
  • [22] Centrifuge modelling of tunnelling below existing twin tunnels with different types of support
    Fang, Qian
    Liu, Xiang
    Zeng, Kehan
    Zhang, Xuedong
    Zhou, Mozhen
    Du, Jianming
    UNDERGROUND SPACE, 2022, 7 (06) : 1125 - 1138
  • [23] Field Test Optimization of Shield Tunnelling Parameters Undercrossing an Existing High-Speed Railway Tunnel: A Case Study
    Huang, Zhen
    Zhang, Hai
    Long, Zhen
    Qiu, Wenge
    Meng, Guowang
    Zhu, Lianchen
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2021, 39 (02) : 1381 - 1398
  • [24] Mechanical Behaviors of Existing Large-Diameter Tunnel Induced by Horseshoe-Shaped Undercrossing Twin Tunnels in Gravel
    Li, Jianye
    Fang, Qian
    Liu, Xiang
    Du, Jianming
    Wang, Gan
    Wang, Jun
    APPLIED SCIENCES-BASEL, 2022, 12 (14):
  • [25] Tunnelling 4.0: New Technologies and Future Prospects for the Maintenance and Restoration and Upgrading of Existing Tunnels
    不详
    GALLERIE E GRANDI OPERE SOTTERRANEE, 2020, (133): : 62 - 62
  • [26] Field Test Optimization of Shield Tunnelling Parameters Undercrossing an Existing High-Speed Railway Tunnel: A Case Study
    Zhen Huang
    Hai Zhang
    Zhen Long
    Wenge Qiu
    Guowang Meng
    Lianchen Zhu
    Geotechnical and Geological Engineering, 2021, 39 : 1381 - 1398
  • [27] Books in Tunnels & Tunnelling
    Tunnels and Tunnelling, 1996, 28 (06):
  • [28] Behaviours of existing shield tunnels due to tunnelling underneath considering asymmetric ground settlements
    Gan, Xiaolu
    Yu, Jianlin
    Gong, Xiaonan
    Liu, Nianwu
    Zheng, Dongzhu
    UNDERGROUND SPACE, 2022, 7 (05) : 882 - 897
  • [29] Field-monitoring and numerical investigation of a super-large-diameter shield tunnel undercrossing existing metro tunnels
    Qin, P.
    Su, Z.
    Zhou, C.
    Xie, J.
    Huang, X.
    GEOSHANGHAI 2024 INTERNATIONAL CONFERENCE, VOL 4, 2024, 1333
  • [30] The effects of undercrossing tunnelling on the settlement of footings subjected to cyclic loading
    Liu, Ying
    Zhang, Zhensheng
    Liu, Zhiyong
    Xue, Jianfeng
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2023, 132