Saudi Arabian aviation construction projects: Identification of risks and their consequences

被引:20
|
作者
Baghdadi, Ahmad [1 ]
Kishk, Mohammed
机构
[1] Robert Gordon Univ, Scott Sutherland Sch Architecture & Built Environ, Aberdeen AB10 7QB, Scotland
关键词
aviation construction projects; GACA; risks; risk management; Saudi Arabia;
D O I
10.1016/j.proeng.2015.10.054
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Airport projects are considered to be very complex, as they face a number of challenges which inevitably expose them to risks. In Saudi Arabia, the aviation sector is considered an important sector due to the fact that Saudi Arabia is the first destination for Muslims on an annual basis. As a result, the Saudi government has allocated a significant amount of its general budget to this sector through the General Authority of Civil Aviation (GACA). However, it has been found that these projects are still delivered with a significant number of time and cost overruns. These consequences are typically generated from the risks involved in the projects. Thus, the aim of this paper was twofold: first, to identify risks associated with aviation construction projects in Saudi Arabia and, second, to evaluate the consequences of these risks on a number of GACA projects. Critical literature reviews of common risks associated with aviation projects have been carried out. These were followed by 13 semi-structured interviews with expert project managers, including clients, contractors and consultants who have been involved in GACA projects. As a result, 54 new risks have been identified and classified into three levels: internal, external and force majeure. Results have confirmed the existence of time and cost overruns for GACA projects. The significance of the identified risks is currently being assessed and will be reported in a further paper. (C) 2015 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:32 / 40
页数:9
相关论文
共 50 条
  • [21] Determinants and Consequences of Green Investment in the Saudi Arabian Hotel Industry
    Abdou, Ahmed Hassan
    Hassan, Thowayeb H.
    Salem, Amany E.
    Elsaied, Mohamed Ahmed
    Elsaed, Ahmed Anwar
    SUSTAINABILITY, 2022, 14 (24)
  • [22] A Framework for the Characterization of Aviation Construction Projects: The Case of UAE
    Alketbi, Mariam Abdalla
    Dalalah, Doraid
    Dweiri, Fikri
    BUILDINGS, 2024, 14 (08)
  • [23] Causes of delay in Saudi public construction projects
    Alsuliman, Jawad A.
    ALEXANDRIA ENGINEERING JOURNAL, 2019, 58 (02) : 801 - 808
  • [24] Identification and Assessment of Major Risks in Syrian Construction Projects: Lattakia-Syria Case
    Kattoub, Reem Ghanem
    Omran, Jamal
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2023, 17 (03) : 524 - 536
  • [25] The Impact of Israeli and Saudi Arabian Geopolitical Risks on the Lebanese Financial Market
    Mansour-Ichrakieh, Layal
    JOURNAL OF RISK AND FINANCIAL MANAGEMENT, 2021, 14 (03)
  • [26] Detailed disclosure to Saudi Arabian patients on risks related to an invasive procedure
    Al-Faleh, Hussam E.
    Al-Majed, Nawaf S.
    Al-Sagheir, Ahmed I.
    Hersi, Ahmad S.
    SAUDI MEDICAL JOURNAL, 2010, 31 (07) : 814 - 818
  • [27] Survey of information technology and the structure of the Saudi Arabian construction industry
    O'Brien, MJ
    Al-Biqami, N
    DURABILITY OF BUILDING MATERIALS AND COMPONENTS 8, VOLS 1-4, PROCEEDINGS, 1999, : 2327 - 2337
  • [28] ANALYZING THE IMPLEMENTATION OF ENVIRONMENTAL LAWS IN THE SAUDI ARABIAN CONSTRUCTION INDUSTRY
    Mansour, M. A. A.
    Khadar, S. D. A.
    Falqi, I. I. A.
    APPLIED ECOLOGY AND ENVIRONMENTAL RESEARCH, 2019, 17 (02): : 3781 - 3802
  • [29] The construction of the universality of English within Saudi Arabian education contexts
    Alhamdan, Bandar
    Honan, Eileen
    Hamid, M. Obaidul
    DISCOURSE-STUDIES IN THE CULTURAL POLITICS OF EDUCATION, 2017, 38 (05) : 627 - 641
  • [30] Engendering project management competencies in Saudi Arabian construction professionals
    Moyo, Tirivavi
    Al-Otaibi, Ali
    Chigara, Benviolent
    JOURNAL OF FACILITIES MANAGEMENT, 2024,