Project Management Maturity Model (PMMM) in educational organizations

被引:37
|
作者
Demir, C. [1 ]
Kocabas, Ibrahim [2 ]
机构
[1] Mus Alparslan Univ, Fac Educ, TR-49100 Mus, Turkey
[2] Furat Univ, Fac Educ, TR-23100 Elazig, Turkey
关键词
Project Management; Maturity Models; Project Management Maturity Model; Capability Project Management; Educational Organizations;
D O I
10.1016/j.sbspro.2010.12.379
中图分类号
G40 [教育学];
学科分类号
040101 ; 120403 ;
摘要
Project Management Maturity Model (PMMM) is getting popular because of its versatility and its ability to control time and cost most efficiently. More and more organizations have embraced Project management as a key strategy for remaining competitive in today's highly competitive business environment. The PMMM allows the organization to identify what steps must be taken, what deeds must be accomplished and in what sequence to realize meaningful and measurable results. The purpose of this study is to see whether PMMM can be used in educational organizations. By the help of maturity model, educational organizations can determine their capability to deliver high education on a five scale. A literature review have been made about maturity model and it has been discussed how to use maturity level in educational organizations in this paper. In order to improve educational organizations' effectiveness, it should become a strategic part of annual plan of the organization. (C) 2010 Elsevier Ltd. All rights reserved
引用
收藏
页数:5
相关论文
共 50 条
  • [21] PMMM Kerzner Questionnaire Validation for Project Management Maturity Level Assessment: One of the Largest Indonesia's State-Owned Bank
    Hutabarat, Novalina
    Raharjo, Teguh
    Hardian, Bob
    Suhanto, Agus
    Wahbi, Andi
    13TH INTERNATIONAL CONFERENCE ON ADVANCED COMPUTER SCIENCE AND INFORMATION SYSTEMS (ICACSIS 2021), 2021, : 151 - +
  • [22] Research on Owner Project Management Maturity Model of Highway Construction Project
    Ren, Yaxi
    Jia, Yuanhua
    PROCEEDINGS OF THE 2017 5TH INTERNATIONAL CONFERENCE ON MECHATRONICS, MATERIALS, CHEMISTRY AND COMPUTER ENGINEERING (ICMMCCE 2017), 2017, 141 : 466 - 470
  • [23] Software project management maturity assessment model to assess software project management practices
    Fauzi, Shukor Sanim Bin Mohd
    Ramli, Nuraminah Bt
    ICCSA 2007: PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON COMPUTATIONAL SCIENCE AND APPLICATIONS, 2007, : 375 - +
  • [24] Project risk management in educational organizations: A case from the Czech Republic
    Eger, Ludvik
    Egerova, Dana
    EDUCATIONAL MANAGEMENT ADMINISTRATION & LEADERSHIP, 2016, 44 (04) : 578 - 598
  • [25] DEVELOPMENT A MODEL TO QUANTITATIVE ASSESSMENT PROJECT MANAGEMENT MATURITY
    Korovkina, N. L.
    Trushkina, E. P.
    BIZNES INFORMATIKA-BUSINESS INFORMATICS, 2010, 14 (04): : 12 - +
  • [26] Research on Maturity Model of Enterprise NPD Project Management
    Ma, Yue
    Chang, Yu
    Zhu, Hanyu
    Xia, Chunyu
    Chang, Zhichao
    ADVANCES IN EDUCATION AND MANAGEMENT, PT IV, 2011, 211 : 328 - 335
  • [27] Project management maturity model and its appraisal method
    Wang, FL
    Proceedings of the 2005 International Conference on Management Science & Engineering (12th), Vols 1- 3, 2005, : 2323 - 2326
  • [28] The Maturity Model Research of Construction Project Management Informationization
    Chen, Jia
    Yu, Gaihua
    Cui, Shuyan
    Feng, Yanru
    ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2222 - 2227
  • [29] Project management process maturity (PM)2 model
    Kwak, YH
    Ibbs, CW
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2002, 18 (03) : 150 - 155
  • [30] Project management maturity model: Concept, research and applications
    Guan, WH
    Li, ZF
    Liu, XZ
    Toshihiro, I
    PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS 1 AND 2, 2004, : 2498 - 2502