Research on a Risk Early Warning Mathematical Model Based on Data Mining in China's Coal Mine Management

被引:5
|
作者
Yu, Kai [1 ,2 ]
Zhou, Lujie [1 ]
Liu, Pingping [1 ]
Chen, Jing [1 ]
Miao, Dejun [1 ]
Wang, Jiansheng [3 ]
机构
[1] Shandong Univ Sci & Technol, Coll Safety & Environm Engn, Qingdao 266590, Peoples R China
[2] Min An Inst Emergency & Safety Management Qingdao, Qingdao 266590, Peoples R China
[3] Huaneng Lingtai Shaozhai Coal Ind Co Ltd, Pingliang 744400, Peoples R China
基金
中国国家自然科学基金;
关键词
risk; early warning; mathematical model; data mining; coal mine management; SAFETY; SYSTEM; MULTISOURCE; DESIGN; TIME;
D O I
10.3390/math10214028
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
The degree of informatization of coal mine safety management is becoming higher and higher, and a large amount of information is generated in this process. How to convert the existing information into useful data for risk control has become a challenge. To solve this challenge, this paper studies the mathematical model of coal mine risk early warning in China based on data mining. Firstly, the coal mine risk data was comprehensively analyzed to provide basic data for the risk prediction model of data mining. Then, the adaptive neuro-fuzzy inference system (ANFIS) was optimized twice to build the coal mine risk prediction model. By optimizing the calculation method of the control chart, the coal mine risk early warning system was proposed. Finally, based on the coal mine risk early warning model, the software platform was developed and applied to coal mines in China to control the risks at all levels. The results show that the error of the optimized ANFIS was reduced by 66%, and the early warning error was reduced by 57%. This study aimed to provide implementation methods and tools for coal mine risk management and control, and data collected has reference significance for other enterprises.
引用
收藏
页数:20
相关论文
共 50 条
  • [31] The Construction and Empirical Analysis of the Company's Financial Early Warning Model Based on Data Mining Algorithms
    Wang, Aiqun
    Yu, Hongxiang
    JOURNAL OF MATHEMATICS, 2022, 2022
  • [32] Construction and application of financial fraud early warning model based on Data Mining
    Qin, Teng
    Cheng, Guanghua
    Wang, Ziwei
    2ND INTERNATIONAL CONFERENCE ON APPLIED MATHEMATICS, MODELLING, AND INTELLIGENT COMPUTING (CAMMIC 2022), 2022, 12259
  • [33] An Intelligent Financial Early Warning System Model Based on Data Mining for SMEs
    Koyuncugil, Ali Serhan
    Ozgulbas, Nermin
    INTERNATIONAL CONFERENCE ON FUTURE COMPUTER AND COMMUNICATIONS, PROCEEDINGS, 2009, : 662 - +
  • [34] Research and Design of Pre-warning System for Coal and Gas Outburst Based on Data Mining
    Deng, Ming
    Liu, Defang
    Liu, He
    Chen, Ningning
    INDUSTRIAL INSTRUMENTATION AND CONTROL SYSTEMS II, PTS 1-3, 2013, 336-338 : 1204 - 1207
  • [35] Risk Early Warning Evaluation of Coal Mine Water Inrush Based on Complex Network and Its Application
    Li, Yanhui
    Bai, Jianbiao
    Yan, Wei
    Wang, Xiangyu
    Wu, Bowen
    Liu, Shuaigang
    Xu, Jun
    Sun, Jiaxin
    ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [36] Research on Food Security Risk Assessment and Early Warning in China Based on BP Neural Network Model
    Hou, Yuke
    Liang, Xin
    JOURNAL OF FOOD QUALITY, 2022, 2022
  • [37] Research on the FinTech risk early warning based on the MS-VAR model: An empirical analysis in China
    Bu, Ya
    Du, Xin
    Li, Hui
    Yu, Xinghui
    Wang, Yuting
    GLOBAL FINANCE JOURNAL, 2023, 58
  • [38] Research on Systematic Risk Assessment and Early Warning of China's Insurance Industry
    Xu Hua
    Luo Jingwen
    Zhu Jiaxin
    PROCEEDINGS OF 2019 CHINA INTERNATIONAL CONFERENCE ON INSURANCE AND RISK MANAGEMENT (CICIRM), 2019, : 271 - 288
  • [39] Student performance early warning based on data mining
    Mi C.
    International Journal of Performability Engineering, 2019, 15 (03): : 822 - 833
  • [40] The Study on Fine Management of China's Coal Mine
    Yang Liening
    PROCEEDINGS OF THE TWELFTH INTERNATIONAL SYMPOSIUM - MANAGEMENT SCIENCE & ENGINEERING (2013), 2013, : 276 - 283