Hierarchic Genetic Algorithm for the Initial Omission Settlement of the Earth-Rock Dam

被引:0
|
作者
Li, Song-Hui [1 ]
Lian, Ji-Jian [1 ]
Qie, Zhi-Hong [2 ]
Chun, Di-Si [1 ]
机构
[1] Tianjin Univ, Sch Civil Engn, Tianjin 300072, Peoples R China
[2] Agr Univ Hebei, Rural & Urban Construct Coll, Baoding 07100, Peoples R China
基金
中国国家自然科学基金;
关键词
earth-rock dam; Initial Omission Settlement; Hierarchic Genetic Algorithm;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The exterior and interior displacements of the earth-rock dam are the important characters which can reflect its operation state. And it also has pivotal function in evaluating the quality of the project and judging whether the crack of the dam appears. The initial omission settlement is a popular problem in the observation of the earth-rock distortion. Because of the constructing schedule, the settlement observation dot is usually set at the time of the revetment accomplished simultaneously or after it finished. And at this time, it will be longer than the time which the dam spend reaching its elevation. Thus, a time difference existed. The quickest phase is just formed during this longer time when the settlement has grown. Usually, more than half of the total settlement has been accomplished during this time. The result shows that not only can the measure not reflect the whole process of the settlement, but the value of the measurement is far away from the fact as well, which makes the value of the observation result discounted greatly. Therefore, whether the calculation for the Initial Omission Settlement of Earth-rock Dam is right appears. The accuracy of these data has a direct influence on the reliability of the conclusion. In the paper, the initial omission settlement of earth-rock dam is optimized based on Hierarchic Genetic Algorithm by setting the omission settlement as new regression gene and optimizing the three parameters in different GA layers. The result has been testified that the value obtained from the HGA model is better than the one from early model which is far away from the real settlement process.
引用
收藏
页码:968 / +
页数:2
相关论文
共 50 条
  • [31] An improved quadratic acceleration integration method of dynamic analysis of earth-rock dam
    Gui, Yang
    Liu Han-long
    ROCK AND SOIL MECHANICS, 2009, 30 (05) : 1497 - 1503
  • [32] Effect of seismic permanent deformation on safety and stability of earth-rock dam slope
    Qi L.
    Chen Q.
    Cai J.
    Transactions of Tianjin University, 2015, 21 (02) : 167 - 171
  • [33] Study on the propagation characteristics of seismic waves perpendicular to the earth-rock dam axis
    Xu, Hao
    Zong, Yu-Quan
    Liu, Jiang-Ping
    Jiang, Xiao-Huan
    Cheng, Fei
    SOIL DYNAMICS AND EARTHQUAKE ENGINEERING, 2024, 186
  • [34] Detection of Leakage in Earth-rock Dam using High Density Resistivity Method
    Fu, Shuyan
    Xiang, Yan
    Wang, Zhanjun
    Zhang, Kai
    Huang, Haiyan
    RESEARCH JOURNAL OF CHEMISTRY AND ENVIRONMENT, 2013, 17 : 215 - 222
  • [35] Risk Analysis of Earth-Rock Dam Breach Based on Dynamic Bayesian Network
    Li, Zongkun
    Wang, Te
    Ge, Wei
    Wei, Dong
    Li, Hanyu
    WATER, 2019, 11 (11)
  • [36] Effect of Seismic Permanent Deformation on Safety and Stability of Earth-Rock Dam Slope
    戚蓝
    陈启振
    蔡建成
    Transactions of Tianjin University, 2015, 21 (02) : 167 - 171
  • [37] Improved quadratic acceleration integration method of dynamic analysis of earth-rock dam
    Key Laboratory for Ministry of Education for Geomechanics and Embankment Engineering, Hohai University, Nanjing 210098, China
    不详
    Rock Soil Mech, 2009, 5 (1497-1503):
  • [38] AR-based Dynamic Sandbox for Hydraulic Earth-rock Dam Break
    Liu, Huiwen
    Wang, Yuan
    Zhang, Dawei
    Gao, Yang
    2024 IEEE CONFERENCE ON VIRTUAL REALITY AND 3D USER INTERFACES ABSTRACTS AND WORKSHOPS, VRW 2024, 2024, : 801 - 802
  • [39] Numerical Analysis of the Wet Deformation for Earth-rock Dam during Water Storage
    Li, Yongquan
    Chen, Junfu
    Tu, Yunzhong
    Zheng, Xiaolei
    NEW MATERIALS AND PROCESSES, PTS 1-3, 2012, 476-478 : 1730 - +
  • [40] Application of concrete cut-off wall to reinforcement of earth-rock dam
    Li, Jing-Long
    Li, Shu-Cai
    Wang, Gang
    Li, Jia-Chun
    Yu, Feng
    Yantu Lixue/Rock and Soil Mechanics, 2006, 27 (SUPPL.): : 75 - 79