Real-time control strategies for predenitrification nitrification activated sludge plants biodegradation control

被引:13
|
作者
Suescun, J
Ostolaza, X
Garcia-Sanz, M
Ayesa, E
机构
[1] CEIT, Sect Environm Engn, San Sebastian 20018, Spain
[2] CEIT, Dept Elect Elect & Control Engn, San Sebastian 20018, Spain
[3] State Univ Navarra, Dept Automat & Computat, Pamplona 31008, Spain
关键词
ammonia control; denitrification; nitrates control; nitrification; pilot-plant; simulation;
D O I
10.2166/wst.2001.0050
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper presents the real-time control strategies developed to regulate both the ammonia and nitrate concentration in the effluent of the new Vitoria WWTP (Spain). Nitrate control aims at the optimal use of the denitrification potential at any moment. For this purpose, the proposed control algorithm continuously adapts the internal recycle flow in order to maintain a desired nitrate set-point in the anoxic zone. Ammonia control aims at maintaining the required average concentration of ammonia in the effluent by manipulating the Dissolved Oxygen (DO) set-point. The control strategies have been based on a hierarchical structure where a high-level or supervisory control selects the set-point of the low-level or conventional controllers. The design of the controllers was carried out using the Quantitative Feedback Theory QFT for the design of robust control systems. Moving average values of some variables have been introduced in order to eliminate the perturbations associated with the daily 24-hour profiles. The controllers have been verified using long-time dynamic simulations based on a mathematical model previously calibrated in pilot plant. Influent load and temperature used in the simulations correspond to the real values measured in the full-scale WWTP during 12 months. The results obtained in the simulations show the good performance and stability of the control strategies independently from external disturbances. A short-time experimental verification of the controllers in pilot plant with real wastewater is also presented.
引用
收藏
页码:209 / 216
页数:8
相关论文
共 50 条
  • [41] Real-Time Public Transport Operations Library of Control Strategies
    Nesheli, Mahmood Mahmoodi
    Ceder, Avishai
    TRANSPORTATION RESEARCH RECORD, 2017, 2647 (01) : 26 - 32
  • [42] Optimization Strategies for Real-Time Control of an Autonomous Melting Probe
    Meerpohl, Christian
    Flasskamp, Kathrin
    Buskens, Christof
    2018 ANNUAL AMERICAN CONTROL CONFERENCE (ACC), 2018, : 3756 - 3762
  • [43] Control strategies for a decentralized, real-time operation of distribution grids
    Drayer, Elisabeth
    Meyer, Franziska
    Hegemann, Jan
    Braun, Martin
    2015 IEEE EINDHOVEN POWERTECH, 2015,
  • [44] A real-time simulation tool for real-time control
    Kwon, WH
    Kim, KB
    Moon, SY
    Choi, SG
    Kim, YS
    ALGORITHMS AND ARCHITECTURES FOR REAL-TIME CONTROL 1997, 1997, : 325 - 329
  • [45] Hard real-time control & real-time linux
    Murillo-Garcia, R
    DR DOBBS JOURNAL, 2003, 28 (11): : 65 - 67
  • [46] SOLIDS CONTROL IN ACTIVATED-SLUDGE PLANTS WITH ALUM
    FINGER, RE
    JOURNAL WATER POLLUTION CONTROL FEDERATION, 1973, 45 (08): : 1654 - 1662
  • [47] CONTROL STRATEGIES FOR THE ACTIVATED-SLUDGE PROCESS.
    Busby, Joseph B.
    Andrews, John F.
    1974, : 343 - 350
  • [48] Activated sludge bulking: A review of causes and control strategies
    Hossain, F.
    Journal of the Institution of Engineers (India): Environmental Engineering Division, 2004, 85 (01): : 1 - 6
  • [49] Dynamic modeling and control strategies for the activated sludge process
    Busby, J.B.
    Andrews, J.F.
    Journal of the Water Pollution Control Federation, 1975, 47 (05): : 1055 - 1080
  • [50] APPLICATION OF MODELS IN DEVELOPING CONTROL STRATEGIES FOR ACTIVATED-SLUDGE WASTEWATER-TREATMENT PLANTS
    HOLMBERG, A
    FORSSTROM, J
    WATER SCIENCE AND TECHNOLOGY, 1984, 16 (5-7) : 587 - 594