Uniprocessor scheduling under time-interval constraints

被引:0
|
作者
de la Rocha, Fabio Rodrigues [1 ]
de Oliveira, Romulo Silva [1 ]
机构
[1] Univ Fed Santa Catarina, Grad Program Elect Engn, Florianopolis, SC, Brazil
来源
ETFA 2007: 12TH IEEE INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, VOLS 1-3 | 2007年
关键词
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper proposes a new task model for expressing timing constraints that do not naturally admit expression in terms of deadlines and periods. In our task model, jobs are divided into segments A, B and C which must execute following this order. Segment A is responsible for performing its computations and compute a time-interval wherein segment B should execute to fulfill some application constraints. Segment C is released after segment B has finished. We consider the execution of B as valid if performed inside that time-interval, otherwise, its contribution. may be considered valueless to its task. The model uses benefit functions to express when a given action should be performed for the maximum benefit. We adapt some scheduling approaches from the literature and present a feasibility test for our scheduling problem.
引用
收藏
页码:111 / 118
页数:8
相关论文
共 50 条