Lessons Learned, Barriers, and Improvement Factors for Mega Building Construction Projects in Developing Countries: Review Study

被引:13
|
作者
Abu Aisheh, Yazan Issa [1 ]
机构
[1] Middle East Univ, Civil Engn Dept, Amman 11831, Jordan
关键词
mega building construction projects; developing countries; construction projects barriers; construction improvement factors; contractor; lessons learned in construction; supervision staff; owner; DELAY CAUSES; MANAGEMENT; SAFETY; MEGAPROJECTS; PERFORMANCE; CONTRACTORS; SYSTEM; COST;
D O I
10.3390/su131910678
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
A mega-project is a major project or a group of projects of significant cost that attract a high level of public attention or political interest because of substantial direct and indirect impacts on the community, environment, and state budget. Capturing and sharing the knowledge from the performance of the current mega projects is essential in order to avoid losing vital corporate knowledge assets in the construction industry. The learned lessons are gained from experience, success, and failure for improving future performance. This research aims to review and read out the lessons learned from 77 research papers that have dealt with the barriers that hinder the successful performance of mega building construction projects in developing countries, identify and classify the main obstacles, and propose improvements for successful implementation and management of mega building construction projects. The results of this paper will help project owners, construction companies, and other stakeholders in developing countries to overcome the limitations in the execution of mega building construction projects.
引用
收藏
页数:17
相关论文
共 50 条
  • [41] Critical success factors for public housing projects in developing countries: a case study of Nigeria
    Mukhtar, Musa M.
    Bin Amirudin, Roslan
    Sofield, Trevor
    Bin Mohamad, Ismail
    ENVIRONMENT DEVELOPMENT AND SUSTAINABILITY, 2017, 19 (05) : 2039 - 2067
  • [42] Developing Mitigation Measures for Delays in Building Construction Projects: A Case Study in the City of Isfahan, Iran
    Abedi, Mohammad
    Mohamad, Mohammad Fadhil
    Fathi, Mohamad Syazli
    Rambat, Suib
    INTERNATIONAL CONSTRUCTION BUSINESS & MANAGEMENT SYMPOSIUM 2011: WINNING & SUSTAINABLE STRATEGIES FOR INTERNATIONAL PROJECTS, 2011, : 348 - 356
  • [43] Critical Factors Affecting Quality in Building Construction Projects: Systematic Review and Meta-Analysis
    Gurmu, Argaw Tarekegn
    Mahmood, Muhammad Nateque
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (03)
  • [44] Key factors contributing to construction delays in high-rise building projects: a case study of Nigeria's developing urban landscape
    Oyediran, Abiola Oluwasogo
    Akinradewo, Opeoluwa
    Onososen, Adetayo Olugbenga
    Koriko, Oluwagbemisola
    JOURNAL OF FACILITIES MANAGEMENT, 2025,
  • [45] Financial evaluation program for construction projects at the pre-investment phase in developing countries: A case study
    Halawa, Wael Said
    Abdelalim, Assem M. K.
    Abd Elrashed, Ibrahem
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2013, 31 (06) : 912 - 923
  • [46] COST OVERRUN IN CONSTRUCTION PROJECTS IN DEVELOPING COUNTRIES, GAS-OIL INDUSTRY OF IRAN AS A CASE STUDY
    Derakhshanalavijeh, Roya
    Cardoso Teixeira, Jose Manuel
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2017, 23 (01) : 125 - 136
  • [47] Critical success factors for sustainable mass housing projects in developing countries: A case study of Nigeria
    Mukhtar, M. M.
    Mustapha, M. M.
    SUSTAINABLE BUILDINGS AND STRUCTURES: BUILDING A SUSTAINABLE TOMORROW, 2020, : 263 - 268
  • [48] The Strategies of Outspreading Smart Materials in Building Construction Industry in Developing Countries; Case Study: Iran
    Mandavinejad, Mohammadjavad
    Bemanian, Mohammadreza
    Abolvardi, Ghazal
    Khaksar, Neda
    COMPUTER COMMUNICATION AND MANAGEMENT, 2011, 5 : 290 - 294
  • [49] Lessons learned for future transparency capacity building under the Paris Agreement: A review of greenhouse gas inventory capacity building projects in Viet Nam and Cambodia
    Umemiya, Chisa
    Ikeda, Mariko
    White, Molly K.
    JOURNAL OF CLEANER PRODUCTION, 2020, 245
  • [50] What contributes to the success of IT projects? Success factors, challenges and lessons learned from an empirical study of software projects in the Norwegian public sector
    Mohagheghi, Parastoo
    Jorgensen, Magne
    PROCEEDINGS OF THE 2017 IEEE/ACM 39TH INTERNATIONAL CONFERENCE ON SOFTWARE ENGINEERING COMPANION (ICSE-C 2017), 2017, : 371 - 373