Constraint programming-based transformation approach for a mixed fuzzy-stochastic resource investment project scheduling problem

被引:6
|
作者
Subulan, Kemal [1 ]
Cakir, Gizem [2 ]
机构
[1] Dokuz Eylul Univ, Fac Engn, Dept Ind Engn, Izmir, Turkey
[2] Dokuz Eylul Univ, Grad Sch Nat & Appl Sci, Izmir, Turkey
关键词
Resource investment project scheduling problem; Constraint programming; Fuzzy mathematical programs; Scenario-based stochastic programs; ERP implementation projects; OPTIMIZATION MODELS; GENETIC ALGORITHM; UNCERTAINTY; HEURISTICS; SELECTION; SEARCH; RCPSP; RISK;
D O I
10.1007/s00500-021-06399-5
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In fuzzy mathematical programming literature, most of the transformation approaches were mainly focused on integer linear programs (ILPs) with fuzzy parameters/variables. However, ILP-based solution approaches may be inadequate for solving large-scaled combinatorial fuzzy optimization problems, like project scheduling under mixed fuzzy-stochastic environments. Moreover, many real-life project scheduling applications may contain different types of uncertainties such as fuzziness, stochasticity, and dynamism simultaneously. Based on these motivations, this paper presents a novel constraint programming (CP)-based transformation approach for solving a multi-objective and multi-mode, fuzzy-stochastic resource investment project scheduling problem (FS-MRIPSP) which is a well-known NP-complete problem. In fact, the proposed approach mainly depends on a bound and decomposition principle which divides fuzzy components of the problem into the crisp middle, lower, and upper level problems. Thus, it reduces the problem dimension and does not need to use any standard fuzzy arithmetic and ranking operations directly. Furthermore, the stochastic nature of the problem is also taken into account by using a multi-scenario-based stochastic programming technique. Finally, a weighted additive fuzzy goal program is embedded into the proposed CP-based transformation approach to produce compromise fuzzy project schedules that trade-off between expected values of project makespan and total resource usage costs. To show the validity and practicality of the proposed approach, a real-life application is presented for the production-and-operations management module implementation process of an international Enterprise Resource Planning software company. The fuzzy-stochastic project schedules generated by the proposed CP-based approach are also compared to the results of a similar ILP-based method. Computational results have shown that the CP-based approach outperforms the ILP-based method in terms of both solution quality and computational time.
引用
收藏
页码:2523 / 2560
页数:38
相关论文
共 50 条
  • [21] Nonlinear fuzzy chance constrained approach for multi-objective mixed fuzzy-stochastic optimization problem
    Kumar, Ajeet
    Mishra, Babita
    OPSEARCH, 2024, 61 (01) : 121 - 136
  • [22] Nonlinear fuzzy chance constrained approach for multi-objective mixed fuzzy-stochastic optimization problem
    Ajeet kumar
    Babita Mishra
    OPSEARCH, 2024, 61 : 121 - 136
  • [23] A Constraint Programming Approach to Solve Multi-skill Resource-constrained Project Scheduling Problem with Calendars
    Nikaeen, R.
    Najafi, A. A.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2022, 35 (08): : 1579 - 1587
  • [24] A Constraint Programming Approach to Solve Multi-skill Resource-constrained Project Scheduling Problem with Calendars
    Nikaeen, R.
    Najafi, A.A.
    International Journal of Engineering, Transactions B: Applications, 2022, 35 (08):
  • [25] An interval-stochastic programming based approach for a fully uncertain multi-objective and multi-mode resource investment project scheduling problem with an application to ERP project implementation
    Subulan, Kemal
    EXPERT SYSTEMS WITH APPLICATIONS, 2020, 149 (149)
  • [26] A Genetic Programming-Based Iterative Approach for the Integrated Process Planning and Scheduling Problem
    Zhu, Xuedong
    Guo, Xinxing
    Wang, Weihao
    Wu, Jianguo
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2022, 19 (03) : 2566 - 2580
  • [27] An Evolutionary Multi-objective Scenario-Based Approach for Stochastic Resource Investment Project Scheduling
    Xiong, Jian
    Liu, Jing
    Chen, Yingwu
    Abbass, Hussein A.
    2011 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2011, : 2767 - 2774
  • [28] A Knowledge-Based Evolutionary Multiobjective Approach for Stochastic Extended Resource Investment Project Scheduling Problems
    Xiong, Jian
    Liu, Jing
    Chen, Yingwu
    Abbass, Hussein A.
    IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2014, 18 (05) : 742 - 763
  • [29] Simulation based approach for improving heuristics in stochastic resource-constrained project scheduling problem
    Choi, J
    Lee, JH
    Realff, MJ
    PROCESS SYSTEMS ENGINEERING 2003, PTS A AND B, 2003, 15 : 439 - 444
  • [30] A simulation-based approximate dynamic programming approach to dynamic and stochastic resource-constrained multi-project scheduling problem
    Satic, U.
    Jacko, P.
    Kirkbride, C.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 315 (02) : 454 - 469