Constraint programming-based transformation approach for a mixed fuzzy-stochastic resource investment project scheduling problem

被引:6
|
作者
Subulan, Kemal [1 ]
Cakir, Gizem [2 ]
机构
[1] Dokuz Eylul Univ, Fac Engn, Dept Ind Engn, Izmir, Turkey
[2] Dokuz Eylul Univ, Grad Sch Nat & Appl Sci, Izmir, Turkey
关键词
Resource investment project scheduling problem; Constraint programming; Fuzzy mathematical programs; Scenario-based stochastic programs; ERP implementation projects; OPTIMIZATION MODELS; GENETIC ALGORITHM; UNCERTAINTY; HEURISTICS; SELECTION; SEARCH; RCPSP; RISK;
D O I
10.1007/s00500-021-06399-5
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In fuzzy mathematical programming literature, most of the transformation approaches were mainly focused on integer linear programs (ILPs) with fuzzy parameters/variables. However, ILP-based solution approaches may be inadequate for solving large-scaled combinatorial fuzzy optimization problems, like project scheduling under mixed fuzzy-stochastic environments. Moreover, many real-life project scheduling applications may contain different types of uncertainties such as fuzziness, stochasticity, and dynamism simultaneously. Based on these motivations, this paper presents a novel constraint programming (CP)-based transformation approach for solving a multi-objective and multi-mode, fuzzy-stochastic resource investment project scheduling problem (FS-MRIPSP) which is a well-known NP-complete problem. In fact, the proposed approach mainly depends on a bound and decomposition principle which divides fuzzy components of the problem into the crisp middle, lower, and upper level problems. Thus, it reduces the problem dimension and does not need to use any standard fuzzy arithmetic and ranking operations directly. Furthermore, the stochastic nature of the problem is also taken into account by using a multi-scenario-based stochastic programming technique. Finally, a weighted additive fuzzy goal program is embedded into the proposed CP-based transformation approach to produce compromise fuzzy project schedules that trade-off between expected values of project makespan and total resource usage costs. To show the validity and practicality of the proposed approach, a real-life application is presented for the production-and-operations management module implementation process of an international Enterprise Resource Planning software company. The fuzzy-stochastic project schedules generated by the proposed CP-based approach are also compared to the results of a similar ILP-based method. Computational results have shown that the CP-based approach outperforms the ILP-based method in terms of both solution quality and computational time.
引用
收藏
页码:2523 / 2560
页数:38
相关论文
共 50 条
  • [1] Constraint programming-based transformation approach for a mixed fuzzy-stochastic resource investment project scheduling problem
    Kemal Subulan
    Gizem Çakır
    Soft Computing, 2022, 26 : 2523 - 2560
  • [2] A constraint programming approach for the resource-constrained project scheduling problem
    Liess, Olivier
    Michelon, Philippe
    ANNALS OF OPERATIONS RESEARCH, 2008, 157 (01) : 25 - 36
  • [3] A constraint programming approach for the resource-constrained project scheduling problem
    Olivier Liess
    Philippe Michelon
    Annals of Operations Research, 2008, 157 : 25 - 36
  • [4] Tabu search and constraint programming-based approach for a real scheduling and routing problem
    El Fallahi, Abdellah
    Anass, El Yaakoubi
    Cherkaoui, Mohammad
    INTERNATIONAL JOURNAL OF APPLIED MANAGEMENT SCIENCE, 2020, 12 (01) : 50 - 67
  • [5] A mixed-integer linear programming model for solving fuzzy stochastic resource constrained project scheduling problem
    Yagub Alipouri
    Mohammad Hassan Sebt
    Abdollah Ardeshir
    Mohammad Hossein Fazel Zarandi
    Operational Research, 2020, 20 : 197 - 217
  • [6] A mixed-integer linear programming model for solving fuzzy stochastic resource constrained project scheduling problem
    Alipouri, Yagub
    Sebt, Mohammad Hassan
    Ardeshir, Abdollah
    Zarandi, Mohammad Hossein Fazel
    OPERATIONAL RESEARCH, 2020, 20 (01) : 197 - 217
  • [7] Solving the integrated process planning and scheduling problem using an enhanced constraint programming-based approach
    Shi, Ganquan
    Yang, Zhouwang
    Xu, Yang
    Quan, Yuchen
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2022, 60 (18) : 5505 - 5522
  • [8] A constraint programming-based approach to the crew scheduling problem of the Taipei mass rapid transit system
    Han, Anthony F.
    Li, Elvis C.
    ANNALS OF OPERATIONS RESEARCH, 2014, 223 (01) : 173 - 193
  • [9] A constraint programming-based approach to the crew scheduling problem of the Taipei mass rapid transit system
    Anthony F. Han
    Elvis C. Li
    Annals of Operations Research, 2014, 223 : 173 - 193
  • [10] A constraint programming-based solution approach for medical resident scheduling problems
    Topaloglu, Seyda
    Ozkarahan, Irem
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) : 246 - 255