共 50 条
- [42] Job-Shop Scheduling Using Hybrid Shuffled Frog Leaping 2009 14TH INTERNATIONAL COMPUTER CONFERENCE, 2009, : 669 - +
- [45] Two-Phase Shuffled Frog-Leaping Algorithm 2014 3RD INTERNATIONAL CONFERENCE ON RELIABILITY, INFOCOM TECHNOLOGIES AND OPTIMIZATION (ICRITO) (TRENDS AND FUTURE DIRECTIONS), 2014,
- [47] Solving a bi-criteria permutation flow-shop problem using shuffled frog-leaping algorithm Soft Computing, 2008, 12 : 435 - 452
- [48] Improved Shuffled Frog-Leaping Algorithm and Its Application MECHANICAL ENGINEERING AND GREEN MANUFACTURING II, PTS 1 AND 2, 2012, 155-156 : 92 - 96
- [49] Centroid Mutation Embedded Shuffled Frog-Leaping Algorithm PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON INFORMATION AND COMMUNICATION TECHNOLOGIES, ICICT 2014, 2015, 46 : 127 - 134