Minimizing the total weighted completion time in relocation scheduling

被引:0
|
作者
Su, Yi-Chen [1 ]
Lin, Bertrand M. T. [1 ]
机构
[1] Natl Yang Ming Chiao Tung Univ, Inst Informat Management, Hsinchu 300, Taiwan
关键词
Relocation problem; Resource-constrained scheduling; Total weighted completion time; Heuristic algorithm; SUBJECT; CLASSIFICATION; CONSTRAINTS; COMPLEXITY; ALGORITHM; MODELS;
D O I
10.1016/j.cie.2022.108662
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This study investigates a resource-constrained scheduling problem to minimize the total weighted completion time. A set of jobs is to be processed on a single machine subject to the limited availability of a single-type resource. An initial level of the resource is provided to support the processing of the jobs. Each job requires an amount of the resource to commence its processing, and returns an amount of the resource back to the resource pool when its processing is finished. The amount of the resource consumed and that returned by each job may not be identical. Minimizing the total weighted completion time under this resource-constraint setting is known to be strongly NP-hard. In this study, we propose several optimality dominance properties, a lower bound and two approximate bounds for developments of branch-and-bound-based approximation algorithms. Heuristic algorithms and subsequent improvement procedures are deployed to produce initial upper bounds for the branch-and-bound-based approximation algorithms. We conduct computational experiments to appraise the performance of the proposed properties and algorithms.
引用
收藏
页数:12
相关论文
共 50 条
  • [31] Minimizing total weighted completion time on identical parallel batch machines
    Li, Shuguang
    Li, Guojun
    Qi, Xingqin
    INTERNATIONAL JOURNAL OF FOUNDATIONS OF COMPUTER SCIENCE, 2006, 17 (06) : 1441 - 1453
  • [32] A PTAS for minimizing the total weighted completion time on identical parallel machines
    Skutella, M
    Woeginger, GJ
    MATHEMATICS OF OPERATIONS RESEARCH, 2000, 25 (01) : 63 - 75
  • [33] Minimizing Total Weighted Completion Time with Uncertain Data: A Stability Approach
    Sotskov, Yu. N.
    Egorova, N. G.
    Werner, F.
    AUTOMATION AND REMOTE CONTROL, 2010, 71 (10) : 2038 - 2057
  • [34] Minimizing total weighted completion time with an unexpected machine unavailable interval
    Huo, Yumei
    Reznichenko, Boris
    Zhao, Hairong
    JOURNAL OF SCHEDULING, 2014, 17 (02) : 161 - 172
  • [35] Minimizing total weighted completion time with uncertain data: A stability approach
    Yu. N. Sotskov
    N. G. Egorova
    F. Werner
    Automation and Remote Control, 2010, 71 : 2038 - 2057
  • [36] Minimizing the total weighted delivery time in container transportation scheduling
    Lee, Kangbok
    Choi, Byung-Cheon
    Leung, Joseph Y-T
    Pinedo, Michael L.
    Briskorn, Dirk
    NAVAL RESEARCH LOGISTICS, 2012, 59 (3-4) : 266 - 277
  • [37] Customer order scheduling to minimize total weighted completion time
    Wang, Guoqing
    Cheng, T. C. Edwin
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2007, 35 (05): : 623 - 626
  • [38] On-line scheduling on a single machine: minimizing the total completion time
    Fiat, A
    Woeginger, GJ
    ACTA INFORMATICA, 1999, 36 (04) : 287 - 293
  • [39] Scheduling hybrid flow shop for minimizing total weight completion time
    Gao, Cong
    Tang, Lixin
    2007 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS, VOLS 1-6, 2007, : 809 - 813
  • [40] On-line scheduling on a single machine: minimizing the total completion time
    Amos Fiat
    Gerhard J. Woeginger
    Acta Informatica, 1999, 36 : 287 - 293