摘要
Stability and deformation are major geotechnical considerations on soil structures on soft seabed constructed by reclamation. A case study is presented of the application of bathymetric survey to construction control in the Kansai international airport island construction work where by sand drain method is used for soft ground improvement. Effective construction control of such soil structure requires a systematic way of collecting accurate information on progress of consolidation, together with magnitude and distribution of load increment over the improved ground.
引用
收藏
页码:201 / 204
页数:4
相关论文
共 50 条
  • [22] Quality control in Central Japan International Airport construction
    Kitazume, M.
    Satohy, T.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GROUND IMPROVEMENT, 2005, 9 (02) : 59 - 66
  • [23] BIM in the 'New International Airport in Mexico City' project
    Kortstee, Ellen
    van der Geest, Leo
    LIFE-CYCLE OF ENGINEERING SYSTEMS: EMPHASIS ON SUSTAINABLE CIVIL INFRASTRUCTURE, 2017, : 675 - 680
  • [24] Geotechnical aspects of the New Inchon International Airport project
    Kang, BH
    SOIL MECHANICS AND GEOTECHNICAL ENGINEERING, VOL 2, 2001, : 627 - 636
  • [25] BACK-ANALYSIS OF A CASE HISTORY USING FINITE ELEMENT METHOD: THE KANSAI INTERNATIONAL AIRPORT, JAPAN
    D'Ignazio, Marco
    Lansivaara, Tim
    PROCEEDINGS OF THE 5TH INTERNATIONAL YOUNG GEOTECHNICAL ENGINEERS' CONFERENCE (IYGEC 2013), 2013, 2 : 249 - 252
  • [26] Construction of New Seoul International Airport on reclaimed land
    Lee, SC
    Lee, KJ
    Shin, EC
    PROCEEDINGS OF THE SIXTH (1996) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL I, 1996, 1996, : 415 - 419
  • [27] NEW TOKYO INTERNATIONAL AIRPORT AND ITS CONSTRUCTION.
    Ikeda, Michihiro
    Manabe, Shigeto
    Rock Products, 1972, 11 : 61 - 80
  • [28] Construction of New Saddam International Airport in Bagdad.
    Michelet, H.
    Beneteau, C.
    Travaux Paris, 1984, (593): : 6 - 12
  • [29] Interactive behavior of Pleistocene marine foundation of existing 1st phase island due to construction of 2nd phase island of Kansai International Airport
    Mimura, Mamoru
    Jeon, Byung Gon
    SOILS AND FOUNDATIONS, 2013, 53 (03) : 375 - 394
  • [30] New construction control method for airport-island constructed on soft ground
    Fukasawa, T
    Yamane, N
    Mizukami, J
    Kusakabe, O
    Proceedings of the Twelfth Asian Regional Conference on Soil Mechanics and Geotechnical Engineering, Vol 1 and 2, 2003, : 217 - 220