Optimal planning of a multi-station system with sojourn time constraints

被引:3
|
作者
Singer, M [1 ]
Donoso, P [1 ]
Noguer, JL [1 ]
机构
[1] Pontificia Univ Catolica Chile, Escuela Adm, Santiago, Chile
关键词
dynamic system; sojourn times; Lagrangian relaxation; operations planning; resource allocation;
D O I
10.1007/s10479-005-2454-1
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper studies a dynamic production system where multiple products must visit stations where inventories are constrained by maximum and minimum sojourn times with neither negative flow nor backlog being allowed. A resource availability constraint limits the aggregate throughput of the stations. The objective is to minimize the sum of flow and inventory cost. The problem is broken down into several single-product serial systems that serve as subroutines of a Lagrangian relaxation routine. This model is implemented in a spreadsheet so that it can be used by the officials of a Chilean institution for planning the operations and defining the optimal allocation of resources.
引用
收藏
页码:203 / 222
页数:20
相关论文
共 50 条
  • [21] Novel Multi-Station Integrated System and Coordinated Control Strategy
    Huo, Qunhai
    Wang, Wenyong
    Zhang, Ningyu
    Yin, Jingyuan
    Ye, Hua
    Wei, Tongzhen
    CSEE JOURNAL OF POWER AND ENERGY SYSTEMS, 2025, 11 (01): : 380 - 393
  • [22] Multi-station pallet molding system reduces overhead costs
    Snyder, MR
    MODERN PLASTICS, 1996, 73 (10): : 105 - 105
  • [23] A Study on Design and Control of the Multi-Station Multi-Container Transportation System
    Khuu, Nguyen Huu Loc
    Pham, Van Anh
    Vu, Tran Thanh Cong
    Binh Dao, Vu Thanh
    Truong, Thuy Duy
    Nguyen, Ngoc Phi
    Vo, Tuong Quan
    APPLIED SCIENCES-BASEL, 2022, 12 (05):
  • [24] Multi-station and multi-robot welding path planning based on greedy interception algorithm
    Zhao Guangbao
    Wu Jianhua
    2020 IEEE/ASME INTERNATIONAL CONFERENCE ON ADVANCED INTELLIGENT MECHATRONICS (AIM), 2020, : 1190 - 1195
  • [25] Multi-Station Multi-Robot Welding System Planning and Scheduling Based on STNSGA-D: An Industrial Case Study
    Wang, Ye
    Wang, Xuewu
    Chen, Sanyan
    Gu, Xingsheng
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2024, 21 (04) : 7465 - 7479
  • [26] On the nullspace of TLS multi-station adjustment
    Sterle, Oskar
    Kogoj, Dusan
    Stopar, Bojan
    Kregar, Klemen
    ISPRS JOURNAL OF PHOTOGRAMMETRY AND REMOTE SENSING, 2018, 141 : 1 - 9
  • [27] Multi-station superposition for magnetotelluric signal
    Li Jiang
    Yixian Xu
    Studia Geophysica et Geodaetica, 2013, 57 : 276 - 291
  • [28] Optimal Inspection Allocation for Workstations of Attribute Data with Multi-characteristics in Multi-station Systems
    Rau, Hsin
    Cho, Kuo-Hua
    Wang, Yi-Hsiang
    ADVANCED DESIGN AND MANUFACTURE III, 2011, 450 : 397 - 400
  • [29] Engineering of a multi-station shoulder simulator
    Smith, Simon L.
    Li, Lisa
    Joyce, Thomas J.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART H-JOURNAL OF ENGINEERING IN MEDICINE, 2016, 230 (05) : 470 - 480
  • [30] Multi-station superposition for magnetotelluric signal
    Jiang, Li
    Xu, Yixian
    STUDIA GEOPHYSICA ET GEODAETICA, 2013, 57 (02) : 276 - 291