Improved Approaches to Minimize the Makespan on Single-Machine Scheduling with Periodic Preventive Maintenance Activities

被引:1
|
作者
Zhou, Hongming [1 ]
Tsai, Ya-Chih [2 ]
Wu, Ful-Chiang [2 ]
Huang, Shenquan [1 ]
Chou, Fuh-Der [1 ]
机构
[1] Wenzhou Univ, Coll Mech & Elect Engn, Wenzhou 325035, Zhejiang, Peoples R China
[2] Vanung Univ, Dept Hotel Management, Taoyuan, Taiwan
基金
中国国家自然科学基金;
关键词
TOTAL COMPLETION-TIME; DETERIORATING JOBS; ALGORITHM;
D O I
10.1155/2020/8548463
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper addresses a single-machine scheduling problem with periodic preventive maintenance activities that are predeterministic so that the machine is not available all the time, and jobs have to be processed between two consecutive maintenance periods. We propose a mixed integer programming (MIP) model and two heuristics to minimize the makespan. With more constraints in our model, the model is more efficient than the recent model of Perez-Gonzalez and Framinan , and our model could solve problems with up to fifty jobs. Two heuristic algorithms, namely, H (MW) and H (LB*), are also proposed, in which two bin-packing policies of the minimum waste and minimum lower bound are used, respectively. Furthermore, we also proposed an improvement procedure. The results showed that the heuristic H (MW) outperformed other heuristics of the paper, indicating that the bin-packing policy of the minimum waste is more effective than well-known ones such as full batch and best fit. Additionally, all the heuristic algorithms addressed in this paper combined with the improvement procedure could achieve a similar and high quality of solutions with a very tiny increase in computational expense.
引用
收藏
页数:13
相关论文
共 50 条
  • [21] Single-machine scheduling with periodic maintenance and nonresumable jobs
    Liao, CJ
    Chen, WJ
    COMPUTERS & OPERATIONS RESEARCH, 2003, 30 (09) : 1335 - 1347
  • [22] Single-machine scheduling with periodic maintenance and learning effect
    Wu, Hui
    Zheng, Hongmei
    SCIENTIFIC REPORTS, 2023, 13 (01)
  • [23] Single-machine scheduling problem with preventative maintenance activities
    Wu H.
    Wang B.
    Kongzhi yu Juece/Control and Decision, 2021, 36 (02): : 395 - 402
  • [24] Single machine scheduling with general job-dependent aging effect and maintenance activities to minimize makespan
    Zhao, Chuan-li
    Tang, Heng-yong
    APPLIED MATHEMATICAL MODELLING, 2010, 34 (03) : 837 - 841
  • [25] Single-Machine Scheduling with Fixed Periodic Preventive Maintenance to Minimise the Total Weighted Completion Times
    Zhou, Hongming
    Tsai, Ya-Chih
    Huang, Shenquan
    Chen, Yarong
    Chou, Fuh-Der
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [26] Two-agent single-machine scheduling to minimize resource consumption with a constraint on the makespan
    Liu, Peng P
    Tian, Xiaoyu
    PROCEEDINGS OF 2013 6TH INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING (ICIII 2013) VOL 1, 2013, : 487 - 489
  • [27] Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance
    Low, Chinyao
    Ji, Min
    Hsu, Chou-Jung
    Su, Chwen-Tzeng
    APPLIED MATHEMATICAL MODELLING, 2010, 34 (02) : 334 - 342
  • [28] Equivalence of Some Different Maintenance Activities in Single-Machine Scheduling
    Zou J.
    Yuan J.-J.
    Yuan, Jin-Jiang (yuanjj@zzu.edu.cn), 2018, Springer Science and Business Media Deutschland GmbH (06) : 545 - 556
  • [29] An improved exact algorithm for single-machine scheduling to minimise the number of tardy jobs with periodic maintenance
    Liu, Ming
    Wang, Shijin
    Chu, Chengbin
    Chu, Feng
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (12) : 3591 - 3602
  • [30] Parallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimize makespan
    Xu, Dehua
    Sun, Kaibiao
    Li, Hongxing
    COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (04) : 1344 - 1349