Realizing a high-intensity low-emittance beam in the J-PARC 3-GeV RCS

被引:2
|
作者
Hotchi, H. [1 ]
Harada, H. [1 ]
Kato, S. [1 ]
Okabe, K. [1 ]
Saha, P. K. [1 ]
Shobuda, Y. [1 ]
Tamura, F. [1 ]
Tani, N. [1 ]
Watanabe, Y. [1 ]
Yoshimoto, M. [1 ]
机构
[1] Japan Atom Energy Agcy, J PARC Ctr, Naka, Ibaraki 3191195, Japan
关键词
D O I
10.1088/1742-6596/874/1/012059
中图分类号
O4 [物理学];
学科分类号
0702 ;
摘要
The J-PARC 3-GeV rapid cycling synchrotron is now developing beam studies to realize a high-intensity low-emittance beam with less beam halo. This paper presents the recent experimental results while discussing emittance growth and its mitigation mechanisms.
引用
收藏
页数:7
相关论文
共 50 条
  • [31] Monte carlo calculations for the shielding design of beam injection and extraction areas at the 3-GeV synchrotron in J-PARC
    Japan Atomic Energy Agency, Tokai-mura, Ibaraki 319-1195, Japan
    不详
    Nucl Technol, 2 (519-523):
  • [32] Erratum to: Measurement of continuous degradation of a stripper foil during six months operation with 300 kW beam power in the 3-GeV RCS of J-PARC
    P. K. Saha
    M. Yoshimoto
    H. Hotchi
    H. Harada
    K. Okabe
    Y. Yamazaki
    M. Kinsho
    Y. Irie
    Journal of Radioanalytical and Nuclear Chemistry, 2016, 308 : 375 - 375
  • [33] Numerical study for beam loss occurring for wide-ranging transverse injection painting and its mitigation scenario in the J-PARC 3-GeV RCS
    Hotchi, Hideaki
    Tani, Norio
    Watanabe, Yasuhiro
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2015, 778 : 102 - 114
  • [34] MONTE CARLO CALCULATIONS FOR THE SHIELDING DESIGN OF BEAM INJECTION AND EXTRACTION AREAS AT THE 3-GeV SYNCHROTRON IN J-PARC
    Nakane, Yoshihiro
    Abe, Teruo
    Nakashima, Hiroshi
    NUCLEAR TECHNOLOGY, 2009, 168 (02) : 519 - 523
  • [35] Beam commissioning of two horizontal pulse steering magnets for changing injection painting area from MLF to MR in the 3-GeV RCS OF J-PARC
    Saha, P.K.
    Harada, H.
    Hayashi, N.
    Hotchi, H.
    Kinsho, M.
    Takayanagi, T.
    Tani, N.
    Irie, Y.
    Kato, S.
    IPAC 2013: Proceedings of the 4th International Particle Accelerator Conference, 2013, : 518 - 520
  • [36] Radiation Shielding Calculations for the 3-GeV Proton Synchrotron Accelerator in the J-PARC Facility
    Nakane, Yoshihiro
    Masukawa, Fumihiro
    Abe, Teruo
    Iwamoto, Yosuke
    Nakashima, Hiroshi
    JOURNAL OF NUCLEAR SCIENCE AND TECHNOLOGY, 2008, : 62 - 65
  • [37] Alumina ceramics vacuum duct for the 3GeV-RCS of the J-PARC
    Kinsho, M
    Ogiwara, N
    Saito, Y
    Kabeya, Z
    2005 IEEE PARTICLE ACCELERATOR CONFERENCE (PAC), VOLS 1-4, 2005, : 2066 - 2068
  • [38] Improvements of the charge exchange system at the 3GEV RCS in J-PARC
    JAEA, J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
    不详
    不详
    IPAC - Int. Part. Accel. Conf., (3930-3932):
  • [39] Materials and processing of vacuum components for the high-intensity proton beam accelerator, J-PARC
    Saito, Y
    VACUUM, 2004, 73 (02) : 181 - 186
  • [40] The origin of magnetic alloy core buckling in J-PARC 3 GeV RCS
    Nomura, M.
    Yamamoto, M.
    Schnase, A.
    Shimada, T.
    Suzuki, H.
    Tamura, F.
    Hara, K.
    Hasegawa, K.
    Ohmori, C.
    Toda, M.
    Yoshii, M.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2010, 623 (03): : 903 - 909