共 50 条
- [31] Monte carlo calculations for the shielding design of beam injection and extraction areas at the 3-GeV synchrotron in J-PARC Nucl Technol, 2 (519-523):
- [32] Erratum to: Measurement of continuous degradation of a stripper foil during six months operation with 300 kW beam power in the 3-GeV RCS of J-PARC Journal of Radioanalytical and Nuclear Chemistry, 2016, 308 : 375 - 375
- [33] Numerical study for beam loss occurring for wide-ranging transverse injection painting and its mitigation scenario in the J-PARC 3-GeV RCS NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2015, 778 : 102 - 114
- [35] Beam commissioning of two horizontal pulse steering magnets for changing injection painting area from MLF to MR in the 3-GeV RCS OF J-PARC IPAC 2013: Proceedings of the 4th International Particle Accelerator Conference, 2013, : 518 - 520
- [37] Alumina ceramics vacuum duct for the 3GeV-RCS of the J-PARC 2005 IEEE PARTICLE ACCELERATOR CONFERENCE (PAC), VOLS 1-4, 2005, : 2066 - 2068
- [38] Improvements of the charge exchange system at the 3GEV RCS in J-PARC IPAC - Int. Part. Accel. Conf., (3930-3932):
- [40] The origin of magnetic alloy core buckling in J-PARC 3 GeV RCS NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2010, 623 (03): : 903 - 909