Design and development of software for optimal material cost estimating on aluminum works

被引:0
|
作者
Zaragoza Grife, Jesus Nicolas [1 ]
Solis Carcano, Romel Gilberto [1 ]
Gonzalez Fajardo, Jose Antonio [1 ]
机构
[1] Univ Autonoma Yucatan, Fac Ingn, Cuerpo Acad Ingn Construcc, Cordemex, Mexico
来源
REVISTA DE LA CONSTRUCCION | 2014年 / 13卷 / 03期
关键词
Modeling; optimization; construction; cost estimating; aluminum works;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
One of the main subsystems of any building is the one that generates surroundings, divisions and communication forms between spaces. In many kinds of buildings this is achieved with constructive elements made of aluminum, crystal sheets and other materials. For cost estimating purposes on these elements, waste factors which could vary between different construction sites are carried out for each material involved. This generates a high uncertainty in the cost and the profit as well. The main objective for this research was to develop an extension on a preexistent cost estimating software (SincoWfi) for budget optimization on aluminum works. Functions and the uCalc GNCutter32x components for modeling and optimization solution parameterized cut materials were used. The recommendations of the ICONIX methodology were followed in this development. It was concluded that combining different disciplines and areas of knowledge was possible to obtain an integrated cost estimate and optimize use of materials focused on developing constructive elements whose dimensions can be parameterized in 1D and 2D.
引用
收藏
页码:45 / 53
页数:9
相关论文
共 50 条
  • [41] On Assuring Software Quality and Curbing Software Development Cost
    Kim, Won
    JOURNAL OF OBJECT TECHNOLOGY, 2006, 5 (06): : 35 - 42
  • [42] The effects of software development environment on software cost estimation
    Yahya, Majed A.
    Masoud, Fawaz A. M.
    Hudaib, Amjad
    WMSCI 2006: 10TH WORLD MULTI-CONFERENCE ON SYSTEMICS, CYBERNETICS AND INFORMATICS, VOL I, PROCEEDINGS, 2006, : 239 - +
  • [43] LOW-COST DESIGN SOFTWARE
    不详
    IEEE COMMUNICATIONS MAGAZINE, 1995, 33 (08) : 96 - 96
  • [44] Intranet development and design that works
    Baca, B
    Cassidy, A
    PROCEEDINGS OF THE HUMAN FACTORS AND ERGONOMICS SOCIETY 43RD ANNUAL MEETING, VOLS 1 AND 2, 1999, : 777 - 781
  • [45] Estimating size in incremental software development projects
    Benediktsson, O
    Dalcher, D
    IEE PROCEEDINGS-SOFTWARE, 2005, 152 (06): : 253 - 259
  • [46] Estimating Software Development Effort Based on Phases
    Lenarduzzi, Valentina
    Morasca, Sandro
    Taibi, Davide
    2014 40TH EUROMICRO CONFERENCE SERIES ON SOFTWARE ENGINEERING AND ADVANCED APPLICATIONS (SEAA 2014), 2014, : 305 - 308
  • [47] An evolutionary approach to estimating software development projects
    Aguilar-Ruiz, JS
    Ramos, I
    Riquelme, JC
    Toro, M
    INFORMATION AND SOFTWARE TECHNOLOGY, 2001, 43 (14) : 875 - 882
  • [48] Estimating the software development schedules for advanced products
    Weston, N
    Baxter, LF
    Simmons, JEL
    INNOVATION IN TECHNOLOGY MANAGEMENT - THE KEY TO GLOBAL LEADERSHIP: THE KEY TO GLOBAL LEADERSHIP, 1997, : 585 - 588
  • [49] Estimating Development Effort for Software Architectural Tactics
    Kassab, Mohamad
    Destefanis, Giuseppe
    PERSPECTIVES OF SYSTEM INFORMATICS, PSI 2015, 2016, 9609 : 158 - 169
  • [50] Estimating software development effort with connectionist models
    Wittig, G
    Finnie, G
    INFORMATION AND SOFTWARE TECHNOLOGY, 1997, 39 (07) : 469 - 476