Cost overruns of public sector construction projects: a developing country perspective

被引:44
|
作者
Asiedu, Richard Ohene [1 ]
Adaku, Ebenezer [1 ]
机构
[1] Ghana Inst Management & Publ Adm, Grad Sch Business, Achimota, Ghana
关键词
Developing countries; Construction projects; Public sector; Exploratory factor analysis (EFA); Project cost management; INFRASTRUCTURE PROJECTS; WORKS PROJECTS; RISK ANALYSIS; MANAGEMENT; OPTIMISM; MISREPRESENTATION; UNCERTAINTY; CAUSATION; FORECASTS; DELIVERY;
D O I
10.1108/IJMPB-09-2018-0177
中图分类号
F [经济];
学科分类号
02 ;
摘要
Purpose Cost overrun of construction projects has been a key concern for all stakeholders of projects for many decades now. Many studies have been done in the past and continue to be done currently to understand the underlying causes of construction project cost overruns. However, the empirical evidence of the causes seem not be clear due to the silo approach in understanding the causes of construction project cost overruns. The purpose of this paper is to take the debate a step forward by providing an understanding of the causes of project cost overrun from a system's perspective, especially from a less researched environment. Design/methodology/approach Data were collected and analysed from 131 respondents who were mainly involved in construction works in public procurement entities in Ghana. A two-staged approach was employed in collecting data from the respondents. The first stage involved an interview session with key informants in the construction industry in Ghana to ascertain the detailed causes of cost overrun of construction projects. The second stage focussed on the validation of these detailed factors by a wider stakeholder group through questionnaires. Factor analysis was employed to consolidate these detailed factors into major causes of construction project cost overruns. Findings The results show that there are primarily four major causes of most public sector construction projects cost overruns. These four major causes of cost overruns are poor contract planning and supervision; change orders; weak institutional and economic environment of projects and lack of effective coordination among the contracting parties. Originality/value The study provides more insights as to the critical and major factors that underpin public sector construction projects cost overruns and more importantly provides a basis for common treatment of the multiple risk factors engendering public sector construction projects cost overruns.
引用
收藏
页码:66 / 84
页数:19
相关论文
共 50 条
  • [41] Exploration of Information Technology Governance Practices in the Public Sector: A Developing Country's Perspective
    Ali, Amanat
    Khattak, Muhammad Sajid
    Arfeen, Muhammad Irfanullah
    Yousaf, Laiba
    Chaudhary, Muhammad Azam I.
    INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2022, 22 (01): : 523 - 529
  • [42] Delay and Cost Overruns in Vietnam Large Construction Projects: A Comparison with Other Selected Countries
    Le-Hoai, Long
    Lee, Young Dai
    Lee, Jun Yong
    KSCE JOURNAL OF CIVIL ENGINEERING, 2008, 12 (06) : 367 - 377
  • [43] The Weak Spot of Infrastructure BCA: Cost Overruns in Seven Road and Railway Construction Projects
    Nilsson, Jan-Eric
    JOURNAL OF BENEFIT-COST ANALYSIS, 2022, 13 (02) : 224 - 246
  • [44] Cost Overruns and Failure in Project Management: Understanding the Roles of Key Stakeholders in Construction Projects
    Doloi, Hemanta
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (03) : 267 - 279
  • [45] Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries
    Long Le-Hoai
    Young Dai Lee
    Jun Yong Lee
    KSCE Journal of Civil Engineering, 2008, 12 : 367 - 377
  • [46] An integrated approach to investigate the causes of time delays and cost overruns in Afghanistan construction projects
    Sadat, Hafizullah
    Thomas, Nivea
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024,
  • [47] Investigation of critical factors affecting cost overruns and delays in Egyptian mega construction projects
    Daoud, Ahmed Osama
    El Hefnawy, Mohammed
    Wefki, Hossam
    ALEXANDRIA ENGINEERING JOURNAL, 2023, 83 : 326 - 334
  • [48] Causes of cost overruns in building construction projects in Asian countries; Iran as a case study
    Amini, Shima
    Rezvani, Alireza
    Tabassi, Mohsen
    Sadati, Seyed Saeed Malek
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (07) : 2739 - 2766
  • [49] Factors influencing construction time and cost overruns on high-rise projects in Indonesia
    Kaming, Peter F.
    Olomolaiye, Paul O.
    Holt, Gary D.
    Harris, Frank C.
    Construction Management and Economics, 1997, 15 (01): : 83 - 94
  • [50] COST OVERRUNS IN LONG-TERM PROJECTS
    ARVAN, L
    LEITE, APN
    INTERNATIONAL JOURNAL OF INDUSTRIAL ORGANIZATION, 1990, 8 (03) : 443 - 467