Risk Assessment of PPP Waste to Energy Generation Based on Cloud Model

被引:0
|
作者
Xie, Gaomei [1 ]
Han, Wenhua [1 ]
Wang, Weihua [2 ]
机构
[1] Shanghai Univ Elect Power, Coll Automat Engn, Shanghai, Peoples R China
[2] Guangdong Power Grid Co Ltd, Zhanjiang Power Supply Bur, Power Supply Serv Ctr, Zhanjiang, Guangdong, Peoples R China
关键词
PPP; waste incineration power generation; cloud Model; fuzzy analytic hierarchy process; risk assessment;
D O I
10.1109/PSGEC51302.2021.9542749
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Due to the large number of participants in PPP projects, long operation period, large investment and other factors, the project risk factors have a high degree of ambiguity and randomness. In order to accurately carry out the risk evaluation of PPP projects, this paper proposes a risk evaluation method based on cloud model. Firstly, select the main risk factors and establish a risk factor identification system. At the same time, according to the expert evaluation method and principles of comment index, establish the main risk evaluation index system, and then use improved fuzzy analytic hierarchy process method and entropy weight method to obtain the weight of the risk from the subjective and objective perspectives. According to the reverse cloud model algorithm to obtain the digital characteristics of the secondary risk. The digital characteristics of the secondary risk and the weight are combined to finally obtain the digital characteristics of the total risk of the PPP project, and the forward cloud model generator is used to obtain the cloud model of the total risk. Then according to the cloud model, the risk level standard cloud is given, and the risk level is determined by comparing the similarity of the two cloud images. This paper takes the PPP waste incineration power generation project as an example to verify the proposed method. The results show that the method is effective and scientific, which can provide a reference for future risk assessment of PPP projects.
引用
收藏
页码:209 / 213
页数:5
相关论文
共 50 条
  • [1] Risk Assessment of Water Environment Treatment PPP Projects Based on a Cloud Model
    Zhang, Yaqiong
    He, Nan
    Li, Yijing
    Chen, Yiyang
    Wang, Lei
    Ran, Yunlong
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2021, 2021
  • [2] Fire Risk Assessment Method of Energy Storage Power Station Based on Cloud Model
    Xu, Mingwei
    Li, Ran
    Yao, Haifei
    Hou, Zhiqiang
    Liu, Yutong
    Dai, Chao
    Wang, Ruiqi
    Liu, Guanlin
    Yang, Shangxue
    Li, Yage
    JOURNAL OF ELECTRICAL SYSTEMS, 2024, 20 (03) : 395 - 401
  • [3] Risk assessment for supply chain based on Cloud model
    Li, Shuhao
    Sun, Qiang
    Liu, Shupei
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2021, 41 (02) : 3523 - 3540
  • [4] A failure mode and risk assessment method based on cloud model
    Xinlong Li
    Yan Ran
    Genbao Zhang
    Yan He
    Journal of Intelligent Manufacturing, 2020, 31 : 1339 - 1352
  • [5] Risk Assessment for Power Failure Interruption Based on Cloud Model
    Lin, Yuliang
    2017 CHINESE AUTOMATION CONGRESS (CAC), 2017, : 3360 - 3364
  • [6] Risk Assessment of Tunnel Construction Based on Improved Cloud Model
    Lin, C. J.
    Zhang, M.
    Li, L. P.
    Zhou, Z. Q.
    Liu, S.
    Liu, C.
    Li, T.
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2020, 34 (03)
  • [7] A failure mode and risk assessment method based on cloud model
    Li, Xinlong
    Ran, Yan
    Zhang, Genbao
    He, Yan
    JOURNAL OF INTELLIGENT MANUFACTURING, 2020, 31 (06) : 1339 - 1352
  • [8] Model design of project risk assessment based on cloud theory
    School of Economics and Management, Beijing University of Aeronautics and Astronautics, Beijing 100191, China
    Beijing Hangkong Hangtian Daxue Xuebao, 2008, 12 (1445-1447):
  • [9] Risk Assessment of Water Resources and Energy Security Based on the Cloud Model: A Case Study of China in 2020
    Yang, Yafeng
    Wang, Hongrui
    Zhang, Yuanyuan
    Wang, Cheng
    WATER, 2021, 13 (13)
  • [10] AN ANALYTIC NETWORK PROCESS BASED RISK ASSESSMENT MODEL FOR PPP HYDROPOWER INVESTMENTS
    Akcay, Emre Caner
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2021, 27 (04) : 268 - 277