PROBABILISTIC ANALYSIS OF CONTINUOUS WELDED RAIL STABILITY

被引:0
|
作者
Ungureanu, Valentin-Vasile
Dosa, Adam
Botis, Marius Florin
Comanici, Marius
机构
来源
ANNALS OF DAAAM FOR 2009 & PROCEEDINGS OF THE 20TH INTERNATIONAL DAAAM SYMPOSIUM | 2009年 / 20卷
关键词
continuous welded rail (CWR); track stability analysis; probabilistic computational model;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper presents an algorithm for probabilistic analysis of the continuous welded rail (CWR) track buckling. The main parameters which govern the stability of the CWR track present a great variability. This variability is introduced in the computational model by the statistical distribution of the parameters. The algorithm is based on the evaluation of convolution integrals in a discrete approach using the histograms of the main parameters which characterize the stability of the CWR track.
引用
收藏
页码:1497 / 1498
页数:2
相关论文
共 50 条
  • [21] Guard rail's influence on the stability of continuously welded rail on bridge
    Wei, Xiankui
    Chen, Rong
    Wang, Ping
    Zhongguo Tiedao Kexue/China Railway Science, 2012, 33 (04): : 8 - 12
  • [22] STABILITY ANALYSIS OF HIGH-SPEED RAILWAY CONTINUOUSLY WELDED RAIL TRACK
    Cai, Xiaopei
    Lin, Chao
    Li, Yonggil
    Shi, Xiaobo
    CONSTRUCTION AND MAINTENANCE OF RAILWAY INFRASTRUCTURE IN COMPLEX ENVIRONMENT, 2014, : 166 - 170
  • [23] RELIABILITY CALCULATION AND PARAMETER SENSITIVITY ANALYSIS OF CONTINUOUSLY WELDED RAIL TRACK STABILITY
    Zhang, Xiangmin
    Gao, Liang
    Chen, Xiufang
    KEY TECHNOLOGIES OF RAILWAY ENGINEERING - HIGH SPEED RAILWAY, HEAVY HAUL RAILWAY AND URBAN RAIL TRANSIT, 2010, : 324 - 327
  • [24] Improved destressing of continuous welded rail for better management of rail neutral temperature
    Kish, A
    Samavedam, G
    RAILROADS: INTERCITY RAIL PASSENGER; TRACK DESIGN AND MAINTENANCE; AND OTHER TOPICS, 2005, (1916): : 56 - 65
  • [25] Assessment of buckling risk in continuous welded rail tracks
    Samavedam, G
    Kish, A
    PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT (PSAM 4), VOLS 1-4, 1998, : 1454 - 1459
  • [26] Critical loading for lateral buckling of continuous welded rail
    Sung W.-P.
    Shih M.-H.
    Lin C.-I.
    Go C.G.
    Journal of Zhejiang University-SCIENCE A, 2005, 6 (8): : 878 - 885
  • [27] The critical loading for lateral buckling of continuous welded rail
    SHIH Ming-hsiang
    LIN Cheng-I
    GO Cheer Germ
    Journal of Zhejiang University Science A(Science in Engineering), 2005, (08) : 878 - 885
  • [28] Optimization analysis on embedded track continuous welded rail on simple supported beam bridge
    Feng Q.
    Sun K.
    Luo X.
    Liu Q.
    2018, Huazhong University of Science and Technology (46): : 127 - 132
  • [29] A Dynamic Characteristic Analysis of Continuous Welded Rail Track under Different Longitudinal Stress
    Luo, Yan Yun
    Zhang, Hu
    Liu, Yan
    VIBRATION, STRUCTURAL ENGINEERING AND MEASUREMENT I, PTS 1-3, 2012, 105-107 : 1134 - 1137
  • [30] Reliability analysis of embedded track continuous welded rail on simply supported beam bridge
    Feng Q.-S.
    Sun K.
    Lei X.-Y.
    Chen H.-P.
    Jiaotong Yunshu Gongcheng Xuebao/Journal of Traffic and Transportation Engineering, 2020, 20 (04): : 70 - 79