Balancing assembly line with skilled and unskilled workers

被引:106
|
作者
Corominas, Albert [1 ]
Pastor, Rafael [1 ]
Plans, Joan [1 ]
机构
[1] Univ Politecn Cataluna, IOC Res Inst, E-08028 Barcelona, Spain
来源
关键词
line balancing; application; manufacturing; production;
D O I
10.1016/j.omega.2006.03.003
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we present the process of rebalancing the line at motorcycle-assembly plant. The company found it necessary to rebalance its line, since it needs to increase production in the spring and summer months. The main characteristics of the problem are as follows: (i) the company hires temporary staff, who need more time to carry out their tasks than permanent workers; (ii) there must always be at least one skilled employee working alongside an unskilled one; and (iii) different task groups are incompatible with each other (clean-hands tasks and dirty-hands tasks). The goal is to minimise the number of temporary workers required, given a cycle time and the team of workers on staff. The problem is modelled as a binary linear program (BLP) and solved optimally by means of the ILOG CPLEX 9.0 optimiser. The solution provided, namely 12 permanent workers (skilled) and two temporary workers (unskilled), is an improvement on the solution implemented by the business, which involved 12 permanent workers and four temporary workers. (C) 2006 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1126 / 1132
页数:7
相关论文
共 50 条
  • [41] Risk-averse assembly line worker assignment and balancing problem with limited temporary workers and moving workers
    Liu, Ming
    Liu, Zhongzheng
    Chu, Feng
    Liu, Rongfan
    Zheng, Feifeng
    Chu, Chengbin
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2022, 60 (23) : 7074 - 7092
  • [42] Lean line balancing for an electronics assembly line
    Nguyen Thi Lam
    Le Minh Toi
    Vu Thi Thanh Tuyen
    Do Ngoc Hien
    13TH GLOBAL CONFERENCE ON SUSTAINABLE MANUFACTURING - DECOUPLING GROWTH FROM RESOURCE USE, 2016, 40 : 437 - 442
  • [43] SKILLED-UNSKILLED WAGE DIFFERENTIAL IN CONSTRUCTION
    GUSTMAN, AL
    SEGAL, M
    INDUSTRIAL & LABOR RELATIONS REVIEW, 1974, 27 (02): : 261 - 275
  • [44] A multi-objective co-evolutionary algorithm for energy and cost-oriented mixed-model assembly line balancing with multi-skilled workers
    Zhang, Zikai
    Chica, Manuel
    Tang, Qiuhua
    Li, Zixiang
    Zhang, Liping
    EXPERT SYSTEMS WITH APPLICATIONS, 2024, 236
  • [45] The trade effects of skilled versus unskilled migration
    Egger, Peter H.
    Ehrlich, Maximilian v.
    Nelson, Douglas R.
    JOURNAL OF COMPARATIVE ECONOMICS, 2020, 48 (02) : 448 - 464
  • [46] Skilled labor, unskilled labor, and economic growth
    Mello, Marcelo
    ECONOMICS LETTERS, 2008, 100 (03) : 428 - 431
  • [47] PROJECT RESOURCE BALANCING BY ASSEMBLY LINE BALANCING TECHNIQUES
    MOODIE, CL
    MANDEVIL$DE
    JOURNAL OF INDUSTRIAL ENGINEERING, 1966, 17 (07): : 377 - &
  • [48] Outsourcing and the skilled-unskilled wage gap
    Anwar, Sajid
    ECONOMICS LETTERS, 2013, 118 (02) : 347 - 350
  • [49] Analyzing skilled and unskilled labor efficiencies in the US
    Unel, Bulent
    JOURNAL OF MACROECONOMICS, 2010, 32 (04) : 957 - 967