Numerical simulation of TBM construction ventilation in a long diversion tunnel

被引:33
|
作者
Wang, Xiaoling [1 ]
Zhang, Ziqiang [2 ]
Zhou, Zhengyin [2 ]
Chen, Hongchao [2 ]
机构
[1] Tianjin Univ, Sch Civil Engn, Tianjin 300072, Peoples R China
[2] Tianjin Univ, Sch Environm Sci & Engn, Tianjin 300072, Peoples R China
基金
中国国家自然科学基金;
关键词
A long diversion tunnel; Forced ventilation; Three-dimensional RNG k-epsilon model; Air leakage rate per 100 m; IBM construction; K-EPSILON MODELS; AIR LEAKAGE; FLOWS; SYSTEMS; PIPES;
D O I
10.1016/j.tust.2011.03.001
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A three-dimensional Renormalization-group (RNG) k-epsilon model has been performed for forced ventilation to the working face of a long diversion tunnel, taking into account the effects of air leakage and the frictional resistance along the tunnel. The case study involves the working face during TBM construction of the Xinjiang 81 Daban long diversion tunnel, China. Analysis of the flow-field distribution and the pressure distribution near the working face and tunnel outlet revealed the relationships among the air leakage rate per 100 m, pressure difference at the air leakage port, and quantity of air in the air duct. The simulation results show that the air flux, velocity, and leakage rate gradually decrease along the tunnel. The air leakage rate per 100 m increases logarithmically along with pressure growth when the latter is limited within a certain pressure difference range. A low-pressure area can be found on the duct wall near the air leakage port, and the pressure inside the tunnel gradually decreases from the working face to the tunnel outlet: the velocity is relatively high near the leakage port, and is low in the tunnel. The simulated results were in good agreement with the experimental work by Cigdem Aydin and Hui-min Wang, and the simulated axial velocities of the tunnel were validated with the empirical value. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:560 / 572
页数:13
相关论文
共 50 条
  • [41] Numerical simulation analysis of the construction mechanics in the process of tunnel excavation
    Li, Dongbo
    Zhao, Dong
    Liu, Chunyan
    FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 1590 - 1595
  • [42] Numerical simulation of underground excavated tunnel construction of adjacent structure
    Department of Civil Engineering, Zhejiang University City College, Hangzhou 310015, China
    不详
    Rock Soil Mech, 1600, 2 (547-552):
  • [43] Tunnel ventilation during construction and diffusion of hazardous gases studied by numerical simulations
    Chang, Xiaoke
    Chai, Junrui
    Luo, Jipeng
    Qin, Yuan
    Xu, Zengguang
    Cao, Jing
    BUILDING AND ENVIRONMENT, 2020, 177
  • [44] Numerical simulation of multi-material ALE method for diversion tunnel seismic response
    Lou Yun-feng
    Yang Yan-zhi
    Jin Xian-long
    ROCK AND SOIL MECHANICS, 2014, 35 (07) : 2095 - 2102
  • [45] Numerical simulation of multi-material ALE method for diversion tunnel seismic response
    Lou, Yun-Feng
    Yang, Yan-Zhi
    Jin, Xian-Long
    Yantu Lixue/Rock and Soil Mechanics, 2014, 35 (07): : 2095 - 2102
  • [46] Blast testing and numerical simulation analysis of diversion tunnel upper section for Qianping reservoir
    Ma W.-L.
    Yang Q.-G.
    Zhang G.-Y.
    Ma, Wen-Liang (mawenliangj@aliyun.com), 1600, Inderscience Publishers (37): : 70 - 83
  • [47] Construction Mechanical Characteristics of TBM Pilot and Enlargement Method for Ventilation Tunnel of Wuhai Pumped Storage Power Station
    Fan, Chuanjun
    Qin, Jianmin
    Wang, Guixuan
    APPLIED SCIENCES-BASEL, 2024, 14 (05):
  • [48] Numerical Simulation Algorithm Design of Influence on Existing Tunnel by Underpass Construction of New Tunnel
    Wu, Huajun
    SCIENTIFIC PROGRAMMING, 2021, 2021
  • [49] Numerical Simulation on Effect of Shield Tunnel Construction on Pipelines with 45*Skew Angle and Tunnel
    Guo, Dongliang
    Zhao, Deshen
    ENGINEERING SOLUTIONS FOR MANUFACTURING PROCESSES IV, PTS 1 AND 2, 2014, 889-890 : 1414 - 1416
  • [50] Construction work of Yamba tunnel TBM test section
    Takagi, K
    Tsukada, M
    Watabe, Y
    Iizuka, H
    MODERN TUNNELING SCIENCE AND TECHNOLOGY, VOLS I AND II, 2001, : 545 - 549