Fuzzy programming for multiobjective fuzzy job shop scheduling with alternative machines through genetic algorithms

被引:0
|
作者
Li, FM [1 ]
Zhu, YL
Yin, CW
Song, XY
机构
[1] Chinese Acad Sci, Shenyang Inst Automat, Shenyang 110016, Peoples R China
[2] Chinese Acad Sci, Grad Sch, Beijing 100039, Peoples R China
关键词
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The optimization of Job Shop scheduling is very important because of its theoretical and practical significance. Much research about it has been reported in recent years. But most of them were about classical Job Shop scheduling. The existence of a gap between scheduling theory and practice has been reported in literature. This work presents a robust procedure to solve multiobjective fuzzy Job Shop scheduling problems with some more realistic constraints such as fuzzy processing time, fuzzy duedate and alternative machine constraints for jobs. On the basis of the agreement index of fuzzy duedate and fuzzy completion time, multiobjective fuzzy Job Shop scheduling problems have been formulated as three-objective ones which not only maximize the minimum agreement index but also maximize the average agreement index and minimize the maximum fuzzy completion time. By adopting two-chromosome representation, an extended G&T algorithm which is suitable for solving the fuzzy Job Shop scheduling with alternative machines has been proposed. Finally, numerical examples are given to illustrate the effectiveness of our proposed method that provides a new way to study planning and scheduling problems in fuzzy circumstances.
引用
收藏
页码:992 / 1004
页数:13
相关论文
共 50 条
  • [31] A genetic algorithm for flexible job shop scheduling with fuzzy processing time
    Lei, Deming
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (10) : 2995 - 3013
  • [32] Robust multiobjective optimisation for fuzzy job shop problems
    Jose Palacios, Juan
    Gonzalez-Rodriguez, Ines
    Vela, Camino R.
    Puente, Jorge
    APPLIED SOFT COMPUTING, 2017, 56 : 604 - 616
  • [33] An interactive fuzzy satisfying method for multiobjective nonlinear integer programming problems through genetic algorithms
    Sakawa, M
    Kato, K
    FUZZY SETS AND SYSTEMS - IFSA 2003, PROCEEDINGS, 2003, 2715 : 710 - 717
  • [34] FUZZY CONSTRAINTS IN JOB-SHOP SCHEDULING
    DUBOIS, D
    FARGIER, H
    PRADE, H
    JOURNAL OF INTELLIGENT MANUFACTURING, 1995, 6 (04) : 215 - 234
  • [35] Flexible job-shop scheduling with fuzzy goal through IOCDGA
    College of Mechanical and Electrical Engineering, NUAA, 29 Yudao Street, Nanjing 210016, China
    不详
    Trans. Nanjing Univ. Aero. Astro., 2006, 2 (144-148):
  • [36] Job shop scheduling using fuzzy logic
    O. Bilkay
    O. Anlagan
    S. E. Kilic
    The International Journal of Advanced Manufacturing Technology, 2004, 23 : 606 - 619
  • [37] Job shop scheduling using fuzzy logic
    Bilkay, O
    Anlagan, O
    Kilic, SE
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2004, 23 (7-8): : 606 - 619
  • [38] Fuzzy priority rule for job shop scheduling
    Canbolat, YB
    Gundogar, E
    JOURNAL OF INTELLIGENT MANUFACTURING, 2004, 15 (04) : 527 - 533
  • [39] Fuzzy priority rule for job shop scheduling
    Yavuz Burak Canbolat
    Emin Gundogar
    Journal of Intelligent Manufacturing, 2004, 15 : 527 - 533
  • [40] Multiobjective Flexible Job Shop Scheduling Using Memetic Algorithms
    Yuan, Yuan
    Xu, Hua
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2015, 12 (01) : 336 - 353