An improved fuzzy programming model with an L-R fuzzy number for filter management strategies in fluid power systems under uncertainty

被引:6
|
作者
Nie, S. L. [1 ]
Xiong, Z. B. [2 ]
Li, Y. P. [2 ]
Huang, G. H. [3 ]
Hu, Z. [1 ]
机构
[1] Beijing Univ Technol, Coll Mech Engn & Appl Elect Technol, Beijing 100124, Peoples R China
[2] Peking Univ, Coll Urban & Environm Sci, Beijing 100871, Peoples R China
[3] Univ Regina, Fac Engn, Regina, SK S4S 0A2, Canada
关键词
contaminant sensitivity; decision making; fluid power system; L-R fuzzy number; optimization; AXIAL PISTON MOTOR; CONTAMINATION CONTROL; WASTE MANAGEMENT; ALLOCATION; RESOURCES; ALGORITHM; GA;
D O I
10.1243/09544062JMES1839
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
A fuzzy non-linear programming model is developed for the assessment of filter allocation and replacement strategies in fluid power systems (FPSs) under uncertainty. It can not only handle uncertainties expressed as L-R fuzzy numbers, but also enhance the system robustness by transforming the fuzzy inequalities into inclusive constraints. In modelling formulation, theory of contamination wear is introduced to reflect the interactions between system performance and system contamination level. The developed method has been applied to the planning of filter allocation and replacement for an FPS with a bypass filtration system, and a piecewise linearization approach is proposed for solving model non-linearities. Three different contaminant ingression rates are examined based on a number of filter-installation scenarios. The generated solutions can be used for providing guidance to decision makers to identify better contamination control plans for achieving a minimized system cost and system-failure risk.
引用
收藏
页码:2011 / 2026
页数:16
相关论文
共 50 条
  • [21] An improved fuzzy time-series method of forecasting based on L-R fuzzy sets and its application
    Ghosh, Himadri
    Chowdhury, S.
    Prajneshu
    JOURNAL OF APPLIED STATISTICS, 2016, 43 (06) : 1128 - 1139
  • [22] Nth power of secant and tangent product approximation of L-R fuzzy numbers
    Abuteen, Eman
    AIN SHAMS ENGINEERING JOURNAL, 2024, 15 (01)
  • [23] Development of an Inexact Fuzzy Robust Programming Model for Integrated Evacuation Management under Uncertainty
    Tan, Qian
    Huang, Guo H.
    Wu, Chaozhong
    Cai, Yanpeng
    Yan, Xinping
    JOURNAL OF URBAN PLANNING AND DEVELOPMENT, 2009, 135 (01) : 39 - 49
  • [24] A hybrid interval-parameter fuzzy robust programming method and its application to filter management strategy in fluid power systems
    Nie, S. L.
    Ji, H.
    Huang, Y. Q.
    Li, Y. P.
    Huang, G. H.
    ENGINEERING OPTIMIZATION, 2014, 46 (01) : 15 - 38
  • [25] A Generalized Fuzzy Integer Programming Approach for Environmental Management under Uncertainty
    Fan, Y. R.
    Huang, G. H.
    Huang, K.
    Jin, L.
    Suo, M. Q.
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
  • [26] IFQP: A hybrid optimization method for filter management in fluid power systems under uncertainty
    Nie, S. L.
    Li, Y. P.
    Xiong, Z. B.
    Huang, G. H.
    Hu, B.
    ENGINEERING OPTIMIZATION, 2010, 42 (01) : 45 - 68
  • [27] A fuzzy fractional chance-constrained programming model for air quality management under uncertainty
    Liu, Feng
    Wen, Zhi
    Xu, Ye
    ENGINEERING OPTIMIZATION, 2016, 48 (01) : 135 - 153
  • [28] A fuzzy-stochastic robust programming model for regional air quality management under uncertainty
    Liu, L
    Huang, GH
    Liu, Y
    Fuller, GA
    Zeng, GM
    ENGINEERING OPTIMIZATION, 2003, 35 (02) : 177 - 199
  • [29] Improved IPINP model for contamination control in fluid power systems under uncertainty
    Hu, Zhen
    Nie, Songlin
    Li, Yongping
    Xiong, Zhibing
    PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON FLUID POWER TRANSMISSION AND CONTROL, 2009, : 869 - 874
  • [30] Robust Fully Fuzzy Programming with Fuzzy Set Ranking Method for Environmental Systems Planning Under Uncertainty
    Jin, Lei
    Huang, Guohe H.
    Wang, Li
    Wang, Xiuqian
    ENVIRONMENTAL ENGINEERING SCIENCE, 2013, 30 (06) : 280 - 293