Strategies for avoiding asymmetric information in construction project management

被引:61
|
作者
Schieg, Martin [1 ]
机构
[1] Tech Univ Munich, D-80333 Munich, Germany
关键词
Principal Agent Theory; asymmetric information; Adverse Selection; Moral Hazard; Hold-up; Agency Costs; signalling costs; signalling; screening;
D O I
10.3846/1611-1699.2008.9.47-51
中图分类号
F [经济];
学科分类号
02 ;
摘要
A construction project is characterized by a high number of project participants and a multitude of contract relations. The Principal Agent Theory deals with the design of contracts, especially with respect to asymmetric information. Asymmetric distribution of information in co-operations can have effects before as well as after closing a contract. In construction project management therefore attention has to be paid to where information imbalances occur. Several methods are known with which one can cope with the resulting problems but which in turn cause costs.
引用
收藏
页码:47 / 51
页数:5
相关论文
共 50 条
  • [1] Construction Project Risk Management Based on the View of Asymmetric Information
    Xiang, Pengcheng
    Zhou, Jin
    Zhou, Xiaoyu
    Ye, Kunhui
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2012, 138 (11) : 1303 - 1311
  • [2] Application of Asymmetric Information Theory to Construction Project Risk Management
    Xiang Pengcheng
    PROCEEDINGS OF 2010 INTERNATIONAL SYMPOSIUM ON CONSTRUCTION ECONOMY AND MANAGEMENT (ISCEM2010), 2010, : 1 - 6
  • [3] Information management in construction project management
    Karageorgos, GD
    Chassiakos, AP
    NOVEL DESIGN AND INFORMATION TECHNOLOGY APPLICATIONS FOR CIVIL AND STRUCTURAL ENGINEERING, 1999, : 93 - 98
  • [4] Construction project management information strategy
    Wang, Wei
    BASIC & CLINICAL PHARMACOLOGY & TOXICOLOGY, 2020, 127 : 268 - 269
  • [5] Information standardization of construction project management
    Chen, YQ
    Sun, LB
    PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2: MODERN INDUSTRIAL ENGINEERING AND INNOVATION IN ENTERPRISE MANAGEMENT, 2005, : 1445 - 1448
  • [6] OO information model for construction project management
    Karim, A
    Adeli, H
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 1999, 125 (05) : 361 - 367
  • [7] Construction project cost information management research
    Wen, Zhen
    ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 1433 - 1436
  • [8] Information entropy applied in management of construction project
    School of Civil Eng., Xi'an Univ. of Arch. and Tech., Xi'an 710055, China
    不详
    不详
    Xi'an Jianzhu Keji Daxue Xuebao, 2006, 4 (590-592):
  • [9] Construction of Project Management Using Information System
    Alfawaz, Khaled Mofawiz
    Aljedani, Fahd Mohammed
    COMMUNICATIONS IN MATHEMATICS AND APPLICATIONS, 2022, 13 (02): : 823 - 833
  • [10] Application of Information Technology in Construction Project Management
    Tan, Jianling
    Dong, Xinfa
    Li, Xiaojuan
    ADVANCED RESEARCH ON INFORMATION SCIENCE, AUTOMATION AND MATERIAL SYSTEM, PTS 1-6, 2011, 219-220 : 1012 - 1016