An innovative slab track test-line in China

被引:0
|
作者
Ren, J. [1 ]
Xiang, R. [2 ]
Lechner, B. [3 ]
机构
[1] Southwest Jiao Tong Univ, Sch Civil Engn, Chengdu, Sichuan, Peoples R China
[2] Southwest JiaoTong Univ, Sch Traff & Transportat, Chengdu, Sichuan, Peoples R China
[3] Tech Univ Munich, Inst Rd Railway & Airfield Construct, Munich, Germany
关键词
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper presents the innovative slab track technology that was implemented in 2004 by the Chinese Ministry of Railways (MOR). The railway test-line Suiyu was decided to carry out, on which innovative slab track technology would be applied. With a total length of 13.157 km, the new line stands in southwest of China, which is one part of the eight planned passenger dedicated lines (PDL) in China. It is expected to be loaded annually with 20 million tonne freight transportation and daily with 90 passenger train-couples. Its design speed amounts to 200 km/h for passenger trains and 120 km/h for freight trains, which is the first railway line built with such speed in southwest of China. Six slab track types have been installed on the test-line as a trial, which are introduced in details in this paper, such as reinforced concrete slab with lattice two-block sleepers or with pre-stressed monolithic sleepers, coupled or uncoupled prefabricated slabs-superstructure etc. Turnouts have been laid with embedded, monolithic sleepers for the first time. Special measures were applied for transition zones. Comprehensive measurements in respect of their qualities have been carried out, meanwhile train experiment has also implemented to test every component of slab track as well as substructure.
引用
收藏
页码:1243 / +
页数:2
相关论文
共 50 条
  • [2] Test-Line Technology and Appraisal of the Signal QualitY in Television Networks.
    Flor, Walter
    Rundfunktechnische Mitteilungen, 1980, 24 (04): : 177 - 180
  • [3] Innovative requirements and evaluation methods for slab track design
    Aggestam, Emil
    Ekberg, Anders
    Nielsen, Jens C. O.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2024, 238 (06) : 651 - 661
  • [4] Innovative elastic rail fastening systems for slab track
    Bösterling, Winfried
    ZEVrail, 2011, 135 (05): : 172 - 175
  • [5] Experimental investigation into train-induced vibrations of test-line at metro depot
    Wang, Yi-Min (ctymwang@scut.edu.cn), 1600, South China University of Technology (42):
  • [6] TV OSCILLOSCOPE OPF FOR FULL-FIELD AND TEST-LINE MEASUREMENTS.
    Ebersberger, Gunther
    News from Rohde & Schwarz, 1984, 24 (105): : 18 - 20
  • [7] Dynamic parameters of slab track of passenger transport line
    Xiang, Jun
    Cao, Ye
    Liu, Bao-Gang
    He, Dan
    Zeng, Qing-Yuan
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2007, 38 (05): : 981 - 986
  • [8] Mechanical characteristics of track slab and clamps during the pouring of self-compacting concrete in the China Railway Track System III slab track
    Zhang, Yanrong
    Zhang, Haonan
    Wu, Kai
    Cai, Xiaopei
    Guo, Qiusheng
    Gao, Liang
    Jiang, Jinfeng
    STRUCTURES, 2024, 67
  • [9] Modelling vibrations caused by tram movement on slab track line
    Real, Julia
    Martinez, Pablo
    Montalban, Laura
    Villanueva, Antonio
    MATHEMATICAL AND COMPUTER MODELLING, 2011, 54 (1-2) : 280 - 291
  • [10] Bitterfeld-Halle section of upgraded line and slab track
    Watzlaw, Wolfgang
    Eisenbahningenieur, 1997, 48 (02):