In Hong Kong, there are many construction sites where contractors are implementing their safety programmes inadequately. There are problems/difficulties causing such inefficiency in implementation. 28 building and civil engineering contractors (mostly large/ international contractors) in Hong Kong participated in a survey in which the contractors' opinions in implementing site safety programmes were solicited. Firstly, the problems/difficulties encountered in their site safety schemes were identified. Secondly, opinions on possible methods for improving the present unsatisfactory situation were obtained. Recommendations are then made based on the results of the survey. Possible further investigation works are also suggested.
引用
收藏
页码:525 / 529
页数:5
相关论文
共 50 条
  • [41] Safety climate and safety performance among construction workers in Hong Kong - The role of psychological strains as mediators
    Siu, OL
    Phillips, DR
    Leung, TW
    ACCIDENT ANALYSIS AND PREVENTION, 2004, 36 (03): : 359 - 366
  • [42] Rockfall problems in Hong Kong and some new experimental results for coefficients of restitution
    Chau, K.T.
    Wong, R.H.C.
    Lee, C.F.
    International Journal of Rock Mechanics and Mining Sciences, 1998, 35 (4-5): : 662 - 663
  • [43] Hong Kong construction foremen's safety responsibilities: A case study of management oversight
    Rowlinson, Steve
    Mohamed, Sherif
    Lam, Sum-Wah
    Engineering, Construction and Architectural Management, 2003, 10 (01) : 27 - 35
  • [44] Safe Working Cycle: Is It a Panacea to Combat Construction Site Safety Accidents in Hong Kong?
    Chan, Daniel W. M.
    Aghimien, Douglas O.
    SUSTAINABILITY, 2022, 14 (02)
  • [45] Adjudication: Temporary binding and tiered dispute resolution in construction and engineering: Hong Kong experience
    Hill, Timothy
    Wall, Colin J.
    JOURNAL OF PROFESSIONAL ISSUES IN ENGINEERING EDUCATION AND PRACTICE, 2008, 134 (03) : 306 - 308
  • [46] Social construction of gender inequality in the housing system: Housing experience of women in Hong Kong
    Kwong, TM
    HOUSING STUDIES, 1999, 14 (01) : 118 - 119
  • [47] Noise Impacts from the Hong Kong Airport Railway - Problems, Solutions, and Lessons Learnt
    Mitchell, S. C.
    Frommer, G.
    Laister, S.
    Proceedings - International Conference on Noise Control Engineering, (05):
  • [48] Noise impacts from the Hong Kong airport railway - Problems, solutions, and lessons learnt
    Mitchell, SC
    Frommer, G
    Laister, S
    INTER-NOISE 96 - THE 1996 INTERNATIONAL CONGRESS ON NOISE CONTROL ENGINEERING, 25TH ANNIVERSARY CONGRESS - LIVERPOOL, PROCEEDINGS, BOOKS 1-6: NOISE CONTROL - THE NEXT 25 YEARS, 1996, : 2431 - 2434
  • [49] Contemporary solutions for patients with microtia and congenital aural atresia-Hong Kong experience
    Willis S.S.Tsang
    Michael C.F.Tong
    Peter K.M.Ku
    Kunwar S.S.Bhatia
    Joannie K.Y.Yu
    Terence K.C.Wong
    C.Andrew van Hasselt
    JournalofOtology, 2016, 11 (04) : 157 - 164
  • [50] Implementing Advance Care Planning in ‘The Age of Deferred Death’ - the Hong Kong Experience over 4 Years
    Jean Woo
    The journal of nutrition, health & aging, 2021, 25 : 584 - 589