共 39 条
- [32] Erratum to: Measurement of continuous degradation of a stripper foil during six months operation with 300 kW beam power in the 3-GeV RCS of J-PARC Journal of Radioanalytical and Nuclear Chemistry, 2016, 308 : 375 - 375
- [34] Parasitic slow extraction of extremely weak beam from a high-intensity proton rapid cycling synchrotron NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2014, 737 : 56 - 64
- [35] Beam commissioning of two horizontal pulse steering magnets for changing injection painting area from MLF to MR in the 3-GeV RCS OF J-PARC IPAC 2013: Proceedings of the 4th International Particle Accelerator Conference, 2013, : 518 - 520
- [36] How to Make Extraction Electrode Current Lower than Beam and Corresponding Beam Qualities in J-PARC Cesiated RF-Driven H- Ion Source 66 mA Operation PROCEEDINGS OF THE 17TH INTERNATIONAL CONFERENCE ON ION SOURCES, 2018, 2011
- [39] Investigation of the efficiency of the extraction of a 50-GeV proton beam from a ring accelerator with the use of silicon crystals bent at various angles JETP Letters, 2008, 88 : 229 - 231