Railway track availability modelling with opportunistic maintenance practice

被引:0
|
作者
Davies, Ben [1 ]
Andrews, John [1 ]
机构
[1] Univ Nottingham, Fac Engn, Resilience Engn Res Grp, Pavement Res Bldg, Nottingham NG7 2RD, England
关键词
Climate change; coloured petri net model; degradation model; heatwave; opportunistic maintenance; railway track degradation; tamping; track geometry degradation; HIGH SUMMER TEMPERATURES; BALLAST; NETWORK; OPTIMIZATION; DELAYS;
D O I
10.1177/09544097211047663
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The geometry of railway track must be maintained within certain standards in order to provide a highly available network, as well as good ride comfort and safety for all rail users. Modelling is well utilised as part of asset management tools in exploring the effectiveness of different rail geometry maintenance strategies. By considering the rail route as an entire system - in contrast to a track section in isolation - a more effective maintenance strategy can be developed, including the deployment of opportunistic maintenance practice. This study presents a Coloured Petri Net model of railway track degradation, inspection, and maintenance planning and delivery, for an entire route of track sections. Opportunistic maintenance is introduced through a novel search transition function, which groups interventions based on local adjacency. Testing explores the availability and maintenance demands expected when following a series of different management strategies. This is extended to testing under heatwave conditions, a known disrupter to track geometry maintenance delivery. Simulation results show that in following an opportunistic strategy, greater availability can be achieved on the modelled rail line. Further, resilience to the heatwave disruptions can be achieved by selecting the correct maintenance strategy parameters. This asset management tool can provide guidance on management strategies for a full route of track sections as a combined system.
引用
收藏
页码:907 / 919
页数:13
相关论文
共 50 条
  • [21] Availability Approach to Optimizing Railway Track Renewal Operations
    Caetano, Luis Filipe
    Teixeira, Paulo Fonseca
    JOURNAL OF TRANSPORTATION ENGINEERING, 2013, 139 (09) : 941 - 948
  • [22] Track shifting technology for track maintenance of high-speed railway
    Xu, Lingyan
    Yuan, Wei
    Xie, Jian
    Xie, Haoran
    Zang, Chuanzhen
    Yue, Tong
    Journal of Railway Science and Engineering, 2024, 21 (07) : 2557 - 2568
  • [23] Modelling Maintenance in Railway Infrastructure Management
    Prescott, Darren
    Andrews, John
    59TH ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM (RAMS), 2013,
  • [24] A modelling approach to railway track asset management
    Andrews, John
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2013, 227 (F1) : 56 - 73
  • [25] Modelling the Track Allocation Problem in Railway Stations
    Liu, Wei
    Zhu, Xiaoning
    Kang, Liujiang
    PROCEEDINGS OF THE 2015 4TH INTERNATIONAL CONFERENCE ON SENSORS, MEASUREMENT AND INTELLIGENT MATERIALS, 2016, 43 : 986 - 990
  • [26] Mathematical modelling of railway track geometrical layouts
    Koc, W.
    Mieloszyk, E.
    Archives of Civil Engineering, 1998, 44 (02): : 183 - 198
  • [27] An opportunistic preventive maintenance policy for tamping scheduling of railway tracks
    Bakhtiary, Arash
    Zakeri, Jabbar Ali
    Mohammadzadeh, Saeed
    INTERNATIONAL JOURNAL OF RAIL TRANSPORTATION, 2021, 9 (01) : 1 - 22
  • [28] Design, construction and maintenance or organization of a modem railway track
    Giannakos, KS
    Geotechnics in Pavement and Railway Design and Construction, 2004, : 217 - 224
  • [29] Allocation of effective maintenance limit for railway track geometry
    Khajehei, Hamid
    Ahmadi, Alireza
    Soleimanmeigouni, Iman
    Nissen, Arne
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2019, 15 (12) : 1597 - 1612
  • [30] The impact of summer heatwaves on railway track geometry maintenance
    Davies, Ben
    Andrews, John
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2021, 235 (09) : 1158 - 1171