Study on Estimation Method of Port Container Handling Cost Based on Interval Analysis

被引:0
|
作者
Zhang, Junqi [1 ]
Liu, Yuxi [2 ]
机构
[1] Univ Adelaide, Fac Profess, Adelaide, SA 5000, Australia
[2] Univ Tasmania, Coll Sci & Engn, Hobart, Tas 7005, Australia
关键词
Port container; loading and unloading engineering; cost estimation; mathematical modeling; MODEL; PERFORMANCE; TARGET;
D O I
10.2112/SI95-191.1
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In the port container handling project, it is necessary to construct the mathematical model of the port container handling cost, to realize the overall planning of the port container handling accuracy, and to save the port container loading and unloading expenses. In the traditional mathematical modeling of port container handling cost estimation, the port container loading and unloading cost data sequence is regarded as a group of nonlinear time series by using the forecasting method of uncertain cost fluctuation of port container loading and unloading. The Wolf algorithm is used to forecast the cost of container loading and unloading in the port. The redundant overhead occurs in the cost prediction, and the precision of cost prediction and control is not high. A mathematical modeling and forecasting method based on interval analysis and principal component analysis for port container handling engineering is proposed. The cost of material, labor and machinery per cubic meter is given, the relationship model is analyzed, the cost forecast is carried out by principal component analysis algorithm, the statistical sequence of cost data is constructed, and the optimal cost model is obtained, which is based on time control. Performance control and energy supply, evaluation of reliability index under optimal control, reducing the cost of port container handling engineering and improving the quality of engineering port container loading and unloading. The experimental results show that the model algorithm can improve the accuracy of cost prediction and realize the cost- efficiency-quality balance and optimal ratio of port container loading and unloading engineering more effectively. At the same time, it can reduce the cost and improve the efficiency of container loading and unloading at the same time.
引用
收藏
页码:979 / 984
页数:6
相关论文
共 50 条
  • [41] Research on Standardization Evaluation System of Container Port Safety Production Based on Entropy Weight Method
    Chen, Ning
    Gao, Shanshan
    2019 5TH INTERNATIONAL CONFERENCE ON TRANSPORTATION INFORMATION AND SAFETY (ICTIS 2019), 2019, : 1163 - 1168
  • [42] Prediction and Analysis of Container Terminal Logistics Arrival Time Based on Simulation Interactive Modeling: A Case Study of Ningbo Port
    Wang, Ruoqi
    Li, Jiawei
    Bai, Ruibin
    MATHEMATICS, 2023, 11 (15)
  • [43] Comprehensive benefit evaluation for port container transportation based on Malmquist index and cluster analysis
    He, Yuyan
    Liao, Zhigao
    Huang, Liying
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON ELECTRONICS, MECHANICS, CULTURE AND MEDICINE, 2016, 45 : 51 - 56
  • [44] Parameter Estimation of the AR Model Based on Interval Analysis
    Yang Wei-feng
    Zeng Fang-ling
    2008 INTERNATIONAL SYMPOSIUM ON INTELLIGENT INFORMATION TECHNOLOGY APPLICATION WORKSHOP: IITA 2008 WORKSHOPS, PROCEEDINGS, 2008, : 990 - 993
  • [45] Shipping Container Transportation Cost Adjustment Method Based on Product Life Cycle
    Xu, Xu
    Sun, Ling
    JOURNAL OF COASTAL RESEARCH, 2020, : 649 - 653
  • [46] Fast Single Image Dehazing Method Based on Interval Estimation
    Tang, Qunfang
    Liu, Haibo
    Yang, Jie
    Yu, Bin
    2ND INTERNATIONAL CONFERENCE ON SIMULATION AND MODELING METHODOLOGIES, TECHNOLOGIES AND APPLICATIONS (SMTA 2015), 2015, : 8 - 12
  • [47] A Method for Interval-bound Estimation Based on Grey Theory
    Suo Bin
    Cheng Yongsheng
    Zeng Chao
    2013 FOURTH INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEMS DESIGN AND ENGINEERING APPLICATIONS, 2013, : 9 - 11
  • [48] Interval estimation for software reliability assessment based on MCMC method
    Inoue S.
    Yamada S.
    International Journal of Performability Engineering, 2019, 15 (05) : 1273 - 1278
  • [49] On a fuzzy comprehensive evaluation method based on interval estimation in the LCDLCEDSS
    Wang, Zongjun
    Feng, Shan
    Huazhong Ligong Daxue Xuebao/Journal Huazhong (Central China) University of Science and Technology, 1995, 23 (Sup):
  • [50] Study on the Cluster Selection Method of Echelon Utilization Power Battery Based on Confidence Interval Estimation
    Yan, Ning
    Zhao, Haichuan
    Pan, Xiao
    Ma, Guangchao
    Ma, Shaohua
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2021, 31 (08)