Fuzzy sets on step of planning of experiment for organization and management of construction processes

被引:7
|
作者
Lapidus, Azariy [1 ]
Makarov, Aleksandr [1 ]
机构
[1] Moscow State Univ Civil Engn, Yaroslayskoye Shosse 26, Moscow 129337, Russia
关键词
REGRESSION-ANALYSIS; PREDICTION; CONCRETE; MODELS;
D O I
10.1051/matecconf/20168605003
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this article, problems of mathematical modeling and experiment planning of the organization and management of construction. The authors designated the basic restrictions and the difficulties in this field. Concluded that the planning of research experiment is possible in the information sphere with using of heuristic, graphical, mathematical models, as well as neural networks and genetic algorithms. The authors note the need for use of expert information in the case of the formalization of quality parameters. The article presented an overview of the translation methods of qualitative information into mathematical language. Comparison of methods the qualimetry of USSR scientists, the analytic hierarchy process and fuzzy set theory were performed. The benefits of the latter for interpretation of qualitative parameters were identified. The authors have given many examples of application fuzzy sets for formalization of organizational factors of construction processes. Finally, there conclusion was made about progressiveness and effectiveness of fuzzy set theory to describe the qualitative parameters of organization and management of construction.
引用
收藏
页数:7
相关论文
共 50 条
  • [21] THE GENERATION OF FUZZY SETS AND THE CONSTRUCTION OF CHARACTERIZING FUNCTIONS OF FUZZY DATA
    Kovarova, L.
    Viertl, R.
    IRANIAN JOURNAL OF FUZZY SYSTEMS, 2015, 12 (06): : 1 - 16
  • [22] Economic expectations, fuzzy sets and financial planning
    Tarrazo, M
    Gutierrez, L
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 126 (01) : 89 - 105
  • [23] Experiment Planning in the Simulation of Industrial Processes
    Akberdin A.A.
    Kim A.S.
    Sultangaziev R.B.
    Steel in Translation, 2018, 48 (9) : 573 - 577
  • [24] The Construction of Non-Convex Fuzzy Sets
    Hu, Dan
    Jiang, Tao
    Yu, Xianchuan
    2017 13TH INTERNATIONAL CONFERENCE ON NATURAL COMPUTATION, FUZZY SYSTEMS AND KNOWLEDGE DISCOVERY (ICNC-FSKD), 2017,
  • [25] Construction of rating estimates with the use of fuzzy sets
    Chernov, VG
    JOURNAL OF COMPUTER AND SYSTEMS SCIENCES INTERNATIONAL, 1999, 38 (01) : 88 - 92
  • [26] Representation Theorems for Fuzzy Random Sets and Fuzzy Stochastic Processes
    赵联文
    郭耀煌
    刘海燕
    Journal of Southwest Jiaotong University, 1999, (01) : 102 - 109
  • [27] Simulation experiment for improving construction processes
    Wang, SY
    Halpin, DW
    PROCEEDINGS OF THE 2004 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2004, : 1252 - 1259
  • [28] MANAGEMENT AND ORGANIZATION OF CONSTRUCTION WORK
    KREBS, H
    MASCHINENBAUTECHNIK, 1976, 25 (04): : 187 - 187
  • [29] A novel approach for process planning using polychromatic sets and fuzzy sets
    Zhan, Honghui
    Shao, Xinyu
    Zhan, Guojun
    Zhu, Haiping
    FOURTH INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS AND KNOWLEDGE DISCOVERY, VOL 4, PROCEEDINGS, 2007, : 455 - 461
  • [30] Construction of a two-stage fuzzy management planning model for a computer integrated production management system
    Hsieh, S
    Hsu, S
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2002, 15 (06) : 471 - 483