Risk Analysis of EPC Project Based on ISM

被引:0
|
作者
Cui Caiyun
Huang Wanxin
Ma Nan
机构
关键词
Risk Management; Interpretive Structural Modeling (ISM); Engineering; Procurement and Construction" (EPC);
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Engineering, Procurement and Construction (EPC), is the general way for a constructor to deliver the construction or project products. According to the construction contract, the constructors conduct the project's engineering, procurement and constructing. A number of qualitative and quantitative risk analysis methods have a current problem which is lack of systematization and strategy in risk analysis. It is necessary for EPC project to clear the relationship among different risks before risks appear because the probability of some risk may be changed if one risk event occurred. Aiming at this, Interpretive Structural Modeling (ISM) method which is the most effective solution for the problem was introduced into the risk analysis of EPC project. 11 main risks of the EPC contractors summarized via group brainstorming were assessed by ISM method. Then a Risk-Structure-Figure was set up which shows a clear relationship among the 11 risks. The conclusion is of great value to the quantitative risk analysis, such as Analytical Hierarchy Process (AHP), etc.
引用
收藏
页码:1379 / 1383
页数:5
相关论文
共 50 条
  • [41] Analysis of risk control factors of medical cold chain logistics based on ISM model
    Zhang, Donghua
    Han, Tong
    PROCEEDINGS OF THE 32ND 2020 CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2020), 2020, : 4222 - 4227
  • [42] An Approach to Project Risk Analysis Based on Rough Sets
    Zhao, Ping
    Yi, Shi-xiang
    2010 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-5, 2010, : 1197 - 1202
  • [43] The Project Risk Analysis Model based on Neural Network
    Dong Fugui
    Li Ning
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7440 - 7442
  • [44] Research and Analysis on Software Project Risk Based on Bibliometrics
    Qu, Ying
    Fan, Moran
    PROCEEDINGS OF THE 2018 2ND INTERNATIONAL CONFERENCE ON ECONOMIC DEVELOPMENT AND EDUCATION MANAGEMENT (ICEDEM 2018), 2018, 290 : 138 - 142
  • [45] Study on the Investment Decisions of EPC Project Based on Option Games
    Wang, Xiao-tian
    Xue, Hui-feng
    2011 INTERNATIONAL CONFERENCE ON ECONOMIC, EDUCATION AND MANAGEMENT (ICEEM2011), VOL II, 2011, : 318 - 321
  • [46] Research on Risk System in Power Market Based on ISM
    Feng, Ren
    Cha, Ding
    PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON RISK MANAGEMENT & ENGINEERING MANAGEMENT, VOLS 1 AND 2, 2008, : 167 - 172
  • [47] Study on Risk of Enterprise' Technology Innovation Based on ISM
    Li, Hongyan
    INTELLIGENT COMPUTING AND INFORMATION SCIENCE, PT II, 2011, 135 : 215 - 220
  • [48] Project risk analysis
    Caron, Franco
    SpringerBriefs in Applied Sciences and Technology, 2013, 0 (9788847052437): : 57 - 65
  • [49] Fuzzy Bayesian Belief Networks Method on Risk Assessment of EPC Pipeline Project
    Yusuf, Muhammad
    Latief, Yusuf
    Rarasati, Ayomi Dita
    Trigunarsyah, Bambang
    Laksono, Naufal Budi
    CIVIL ENGINEERING JOURNAL-TEHRAN, 2025, 11 (03): : 1050 - 1071
  • [50] Fuzzy Comprehensive Evaluation Method for Risk Assessment in EPC International Engineering Project
    Liu, Ruiyu
    Ye, Ziwan
    PROCEEDINGS OF CHINA-CANADA INDUSTRY WORKSHOP ON ENTERPRISE RISK MANAGEMENT 2008, 2008, : 293 - 299