Establishment and Repetition Survey of Primary GNSS Control Network of Hong Kong-Zhuhai-Macao Bridge

被引:8
|
作者
Wu, Dijun [1 ]
Xiong, Wei [1 ]
Guo, Jiming [2 ]
机构
[1] China Railway Major Bridge Reconnaissance & Desig, 34 Hanyang Ave, Wuhan 430050, Peoples R China
[2] Wuhan Univ, Sch Geodesy & Geomat, 34 Hanyang Ave, Wuhan 430079, Peoples R China
关键词
Hong Kong-Zhuhai-Macao Bridge (HZMB); Primary Global Navigation Satellite System control network; Engineering coordinate system; Global Navigation Satellite System (GNSS) data processing; Sea-crossing bridge;
D O I
10.1061/(ASCE)SU.1943-5428.0000386
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Hong Kong-Zhuhai-Macao Bridge (HZMB) is the longest sea-crossing bridge in the world. The primary Global Navigation Satellite System (GNSS) control network of the HZMB has the outstanding characteristics and difficulties of long distance across the sea (nearly 32 km) in an approximate east-west direction, poor satellite positioning environment, high precision requirement of construction positioning, long construction period, and complicated transformations of the coordinate systems of China, Hong Kong, Zhuhai, Macao, and the HZMB project. Taking the primary GNSS control network of the HZMB as an example, this paper studied the key technical issues in establishment and repetition survey of the primary GNSS control network of a large-scale and high-precision sea-crossing bridge. Firstly, the three-dimensional engineering coordinate system based on International Terrestrial Reference Frame (ITRF) and the two-dimensional plane coordinate system with projection length deformation less than 5 mm/km were designed and established according to the engineering characteristics and requirements. Secondly, the control point selection, networking, and observation schemes were designed. Thirdly, the data processing technologies of high-precision GNSS control network of sea-crossing bridge and tunnel engineering project, including International GNSS Service (IGS) reference station technology, satellite orbit fixing technology, various error correction techniques, and engineering datum network technology, were studied and put forward. Fourthly, the accuracy analysis of baseline solution and network adjustment was carried out by using the fifth repetition survey data of the primary GNSS control network of the HZMB. Finally, the repetition survey results of the network were compared and analyzed. (C) 2021 American Society of Civil Engineers.
引用
收藏
页数:11
相关论文
共 50 条
  • [21] Research on Unmanned Underwater Comprehensive Inspection System for Hong Kong-Zhuhai-Macao Bridge
    Jing Q.
    Xiao X.
    Bridge Construction, 2023, 53 (06) : 18 - 25
  • [22] Research on the cross-border traffic control operation mode of the Hong Kong-Zhuhai-Macao Bridge
    Sheng Gang
    Yu Jia-qing
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON MECHATRONICS, ROBOTICS AND AUTOMATION (ICMRA 2015), 2015, 15 : 695 - 698
  • [23] Experimental study of the changes of morphodynamic process caused by the Hong Kong-Zhuhai-Macao Bridge
    Ji, Rongyao
    Xu, Qun
    Mo, Siping
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 1504 - 1507
  • [24] Pipe ring design of thoroughfare north arch of Hong Kong-Zhuhai-Macao bridge
    China University of Geosciences, No 388 Lumo Road, Wuhan City, Hubei Province, 430074, China
    不详
    不详
    ICPTT: Sustainable Solutions Water, Sewer, Gas, Oil Pipelines - Proc. Int. Conf. Pipelines Trenchless Technol., (1553-1561):
  • [25] Wind-induced vibrations and suppression measures of the Hong Kong-Zhuhai-Macao Bridge
    Ma, Cunming
    Li, Zhiguo
    Meng, Fanchao
    Liao, Haili
    Wang, Junxin
    WIND AND STRUCTURES, 2021, 32 (03) : 179 - 191
  • [26] Numerical simulation on offshore artificial island cofferdam of Hong Kong-Zhuhai-Macao Bridge
    Wang Tingting
    Liang Heng
    Peng Zhihao
    INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 2020, 62 (04) : 285 - 295
  • [27] Stability of the large cylindrical structures in Hong Kong-Zhuhai-Macao bridge: A case study
    Xiao, Zhong
    Song, Lei
    Li, Jinhui
    APPLIED OCEAN RESEARCH, 2020, 97
  • [28] Morphodynamic Responses to the Hong Kong-Zhuhai-Macao Bridge in the Pearl River Estuary, China
    Li, Mengguo
    Li, Wendan
    Xie, Mingxiao
    Xu, Ting
    JOURNAL OF COASTAL RESEARCH, 2021, 37 (01) : 168 - 178
  • [29] Technologies and Engineering Practices of Intelligent Operation and Maintenance of Hong Kong-Zhuhai-Macao Bridge
    Jing Q.
    Zheng S.-C.
    Liang P.
    Wang J.-F.
    Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2023, 36 (06): : 143 - 156
  • [30] Manufacturing techniques for orthotropic steel deck plates of Hong Kong-Zhuhai-Macao Bridge
    Han, Xiao-Yi
    Bridge Construction, 2015, 45 (05) : 105 - 111