Metaheuristics for two-stage flow-shop assembly problem with a truncation learning function

被引:24
|
作者
Wu, Chin-Chia [1 ]
Zhang, Xingong [2 ]
Azzouz, Ameni [3 ]
Shen, Wei-Lun [1 ]
Cheng, Shuenn-Ren [4 ]
Hsu, Peng-Hsiang [5 ]
Lin, Win-Chin [1 ]
机构
[1] Feng Chia Univ, Dept Stat, Taichung, Taiwan
[2] Chongqing Normal Univ, Coll Math Sci, Chongqing, Peoples R China
[3] Univ Tunis, Inst Superieur Gest, SMART Lab, Tunis, Tunisia
[4] Cheng Shiu Univ, Grad Inst Business Adm, Kaohsiung, Taiwan
[5] Univ Kang Ning, Dept Business Adm, Taipei, Taiwan
基金
中国国家自然科学基金;
关键词
Two-stage assembly; dynamic differential evolution algorithm; genetic algorithm; iterated greedy algorithm; TOTAL COMPLETION-TIME; SCHEDULING PROBLEM; 2-MACHINE FLOWSHOP; SINGLE-MACHINE; EVOLUTIONARY ALGORITHM; WEIGHTED TARDINESS; BOUND ALGORITHM; MINIMIZE; MAKESPAN; SEARCH;
D O I
10.1080/0305215X.2020.1757089
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study examines a two-stage three-machine flow-shop assembly scheduling model in which job processing time is considered as a mixed function of a controlled truncation parameter with a sum-of-processing-times-based learning effect. However, the truncation function is very limited in the two-stage flow-shop assembly scheduling settings. To overcome this limitation, this study investigates a two-stage three-machine flow-shop assembly problem with a truncation learning function where the makespan criterion (completion of the last job) is minimized. Given that the proposed model is NP hard, dominance rules, lemmas and a lower bound are derived and applied to the branch-and-bound method. A dynamic differential evolution algorithm, a hybrid greedy iterated algorithm and a genetic algorithm are also proposed for searching approximate solutions. Results obtained from test experiments validate the performance of all the proposed algorithms.
引用
收藏
页码:843 / 866
页数:24
相关论文
共 50 条
  • [21] THE FLOW-SHOP PROBLEM WITH A COMPOSITE COST FUNCTION
    WOOLLAM, CR
    SAMBANDAM, N
    COMPUTERS & INDUSTRIAL ENGINEERING, 1985, 9 (01) : 83 - 89
  • [22] TWO-OBJECTIVE OPTIMIZATION FOR INTEGRATING PARTS ORDERING, TWO-STAGE ASSEMBLY FLOW-SHOP SCHEDULING, AND DISTRIBUTION THROUGH ROUTING
    Bahmani, Vahid
    Adibi, Mohammad Amin
    Mehdizadeh, Esmaeil
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2023, 30 (03): : 699 - 727
  • [23] Two-stage flexible flow-shop scheduling problem with m identical parallel machines on one stage and a batch processor on the other stage
    Dept. of Mathematics, Shanghai University, Shanghai 200444, China
    J. Harbin Inst. Technol., 2008, 5 (674-678):
  • [24] A two-stage flexible flow-shop scheduling problem with m identical parallel machines on one stage and a batch processor on the other stage
    何龙敏
    孙世杰
    程明宝
    Journal of Harbin Institute of Technology, 2008, (05) : 674 - 678
  • [25] Metaheuristics optimization approaches for two-stage reentrant flexible flow shop with blocking constraint
    Sangsawang, Chatnugrob
    Sethanan, Kanchana
    Fujimoto, Takahiro
    Gen, Mitsuo
    EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (05) : 2395 - 2410
  • [26] A hybrid electromagnetism-like algorithm for two-stage assembly flow shop scheduling problem
    Yan, Hong-Sen
    Wan, Xiao-Qin
    Xiong, Fu-Li
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (19) : 5626 - 5639
  • [27] A Comparative Study of four Metaheuristics Applied for solving the Flow-shop Scheduling Problem
    Bouzidi, Abdelhamid
    Riffi, Moahmmed Essaid
    Barkatou, Mohammed
    PROCEEDINGS OF THE 2015 5TH WORLD CONGRESS ON INFORMATION AND COMMUNICATION TECHNOLOGIES (WICT), 2015, : 140 - 145
  • [28] Effective heuristics and metaheuristics for the distributed fuzzy blocking flow-shop scheduling problem
    Shao, Zhongshi
    Shao, Weishi
    Pi, Dechang
    SWARM AND EVOLUTIONARY COMPUTATION, 2020, 59 (59)
  • [29] A two-stage flow shop scheduling problem with transportation considerations
    Chikhi, Nacira
    Abbas, Moncef
    Benmansour, Rachid
    Bekrar, Abdelghani
    Hanafi, Said
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2015, 13 (04): : 381 - 402
  • [30] A two-stage flow shop scheduling problem with transportation considerations
    Nacira Chikhi
    Moncef Abbas
    Rachid Benmansour
    Abdelghani Bekrar
    Saïd Hanafi
    4OR, 2015, 13 : 381 - 402