Managing a sustainable integrated inventory model for imperfect production process with type one and type two errors

被引:8
|
作者
Rizky, Novrianty [1 ]
Wangsa, Ivan Darma [2 ]
Jauhari, Wakhid Ahmad [3 ]
Wee, Hui Ming [4 ]
机构
[1] Univ Islam Indonesia, Fac Ind Technol, Dept Ind Engn, Yogyakarta 55584, Indonesia
[2] Inst Teknol Sepuluh Nopember, Dept Ind Engn, Kampus ITS, Surabaya 60111, Sukolilo, Indonesia
[3] Sebelas Maret Univ, Dept Ind Engn, Jl Ir Sutami 36 A, Surakarta 57126, Indonesia
[4] Chung Yuan Christian Univ, Dept Ind & Syst Engn, 200 Chung Pei Rd, Taoyuan 32023, Taiwan
关键词
Inventory; Sustainable integrated model; Type I and type II errors; Crashing lead time; Setup cost reduction; PRODUCTION QUANTITY MODEL; ECONOMIC ORDER QUANTITY; QUALITY; POLICY; ITEM;
D O I
10.1007/s10098-021-02194-w
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Unlike previous research, this study develops an integrated inventory model for controllable lead time with defective items, errors in inspection, and variable lead time considering sustainability. The research investigates the effect of controlling lead time and capital investment in the setup cost. We assume that the buyer receives a lot size that may contain some defective items with a known defective probability. The buyer's inspector conducts a 100% quality inspection and may incorrectly classify a non-defective item as a defective item (type one (I) error) or incorrectly classify a defective item as a non-defective item (type two (II) error). The mathematical inventory model considering carbon emission cost is developed, and the solution procedure is designed using the heuristic algorithm to derive the optimal or near optimal solution. Finally, numerical examples and sensitivity analysis are given to illustrate the results. The results show that the defective rate, and type I type II inspection errors, have a significant impact on the shipment lot. This leads to the changes in the total cost, lead time, and the carbon emissions. Our study provides cost savings of 4.39% and carbon emission savings of 28.44%.
引用
收藏
页码:2697 / 2712
页数:16
相关论文
共 50 条
  • [31] Integrated Vendor-Buyer Inventory Model Considering Imperfect Quality and Inspection Errors with Controllable Lead Time
    Sofiana, A.
    Rosyidi, C. N.
    2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 1321 - 1325
  • [32] An integrated production-inventory model for deteriorating items with imperfect quality and shortage backordering considerations
    Wee, H. M.
    Yu, Jonas C. P.
    Wang, K. J.
    COMPUTATIONAL SCIENCE AND ITS APPLICATIONS - ICCSA 2006, PT 3, 2006, 3982 : 885 - 897
  • [33] Integrated multistage supply chain inventory model of multiple retailers with imperfect production and inspection systems
    Chi-Jie Lu
    Ming Gu
    Tian-Shyug Lee
    Chih-Te Yang
    Soft Computing, 2022, 26 : 12057 - 12075
  • [34] INTEGRATED IMPERFECT PRODUCTION INVENTORY MODEL UNDER PERMISSIBLE DELAY IN PAYMENTS DEPENDING ON THE ORDER QUANTITY
    Chiu, Chui-Yu
    Yang, Ming-Feng
    Tang, Chung-Jung
    Lin, Yi
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2013, 9 (04) : 945 - 965
  • [35] A two-warehouse inventory model for items with imperfect quality and penalty costs under screening errors
    Lin, Tien-Yu
    Chin, Ya-Hsien
    JOURNAL OF INFORMATION & OPTIMIZATION SCIENCES, 2011, 32 (02): : 433 - 450
  • [36] Integrated multistage supply chain inventory model of multiple retailers with imperfect production and inspection systems
    Lu, Chi-Jie
    Gu, Ming
    Lee, Tian-Shyug
    Yang, Chih-Te
    SOFT COMPUTING, 2022, 26 (22) : 12057 - 12075
  • [37] An EPQ model for deteriorating items with imperfect production, inspection errors, rework and shortages : a type-2 fuzzy approach
    Rout, Chayanika
    Kumar, Ravi Shankar
    Chakraborty, Debjani
    Goswami, Adrijit
    OPSEARCH, 2019, 56 (03) : 657 - 688
  • [38] An EPQ model for deteriorating items with imperfect production, inspection errors, rework and shortages : a type-2 fuzzy approach
    Chayanika Rout
    Ravi Shankar Kumar
    Debjani Chakraborty
    Adrijit Goswami
    OPSEARCH, 2019, 56 : 657 - 688
  • [39] A sustainable production-inventory model joint with preventive maintenance and multiple shipments for imperfect quality items
    Fallahi, A.
    Azimi-Dastgerdi, M.
    Mokhtari, H.
    SCIENTIA IRANICA, 2023, 30 (03) : 1204 - 1223
  • [40] A sustainable production-inventory model with imperfect quality under preservation technology and quality improvement investment
    Sepehri, Arash
    Mishra, Umakanta
    Sarkar, Biswajit
    JOURNAL OF CLEANER PRODUCTION, 2021, 310