Performance-based contracting in social welfare programs

被引:76
|
作者
Heinrich, Carolyn J. [1 ]
Choi, Youseok [1 ]
机构
[1] Univ Wisconsin, Inst Res Poverty, Madison, WI 53706 USA
来源
关键词
performance-based contracting; program management; social welfare outcomes;
D O I
10.1177/0275074006297553
中图分类号
C93 [管理学]; D035 [国家行政管理]; D523 [行政管理]; D63 [国家行政管理];
学科分类号
12 ; 1201 ; 1202 ; 120202 ; 1204 ; 120401 ;
摘要
The Wisconsin Works (W-2) program changed the administrative structure for social welfare services delivery from county government administration to one that includes performance-based contracting and private sector management of programs. We present a theoretical discussion of government contracting and the implications of alternative contract structures for service provider behavior and performance. We then analyze W-2 contract design and management across four contract periods (1997-2005) as the state transitioned to a performance-based contracting regime. We find that the state made rational changes in the W-2 contract specifications and performance measures that should have improved contract efficiency and effectiveness over time, and service providers responded to these changes in allocating effort toward the achievement of priority performance goals. At the same time, deficiencies in program administration and contract management contributed to some contract and performance failures and setbacks.
引用
收藏
页码:409 / 435
页数:27
相关论文
共 50 条
  • [41] Performance-based contracting in service supply chains: a service provider risk perspective
    Selviaridis, Kostas
    Norrman, Andreas
    SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL, 2014, 19 (02) : 153 - 172
  • [42] Benefits and uncertainties of performance-based contracting in manufacturing industries An agency theory perspective
    Hypko, Phillipp
    Tilebein, Meike
    Gleich, Ronald
    JOURNAL OF SERVICE MANAGEMENT, 2010, 21 (04) : 460 - 489
  • [43] Framework to Implement Performance-Based Contracting for Chip-Seal Road Maintenance
    Shrestha, Kishor
    Shrestha, Pramen P.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (01)
  • [44] Service-Dominant Logic and Performance-Based Contracting: A Systems Thinking Perspective
    Nowicki, David
    Sauser, Brian
    Randall, Wesley
    Lusch, Robert
    SERVICE SCIENCE, 2018, 10 (01) : 12 - 24
  • [45] Performance-based contracting in the district of Columbia: A report on engineering and management lessons learned
    Raynault, Eloisa
    Robinson, Mark
    Lakew, Mesfin
    Rennie, Simon
    Sheldahl, Edward A.
    3rd International Conference on Computing, Communications and Control Technologies, Vol 3, Proceedings, 2005, : 225 - 227
  • [46] Variation of pavement smoothness between adjacent lanes - Implications for performance-based contracting
    Dougan, CE
    Aultman-Hall, L
    Choi, SN
    Overturf, B
    Hobson, C
    PAVEMENT ASSESSMENT, MONITORING, AND EVALUATION 2003: PAVEMENT DESIGN, MANAGEMENT, AND PERFORMANCE, 2003, (1860): : 152 - 158
  • [47] Optimizing rehabilitation strategies for bridge decks under performance-based contracting setting
    Alsharqawi, M.
    Zayed, T.
    Abu Dabous, S.
    MAINTENANCE, SAFETY, RISK, MANAGEMENT AND LIFE-CYCLE PERFORMANCE OF BRIDGES, 2018, : 2529 - 2536
  • [48] Performance-Based Maintenance Contracting in Florida: Evaluation by Surveys, Statistics, and Content Analysis
    Fuller, Jacob
    Brown, Christopher J.
    Crowley, Raphael
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (02)
  • [49] IMPLEMENTING PERFORMANCE-BASED CONTRACTING IN THE JTPA OLDER WORKER PROGRAM - ISSUES AND RECOMMENDATIONS
    LATTING, JK
    JACKSON, RH
    EVALUATION AND PROGRAM PLANNING, 1990, 13 (02) : 133 - 143
  • [50] Condition-based Maintenance Optimization for Gamma Deteriorating Systems under Performance-based Contracting
    Xi Zhu
    Liang Wen
    Juan Li
    Mingchang Song
    Qiwei Hu
    Chinese Journal of Mechanical Engineering, 36