Multi-objective stochastic model for joint optimal allocation of DG units and network reconfiguration from DG owner's and DisCo's perspectives

被引:73
|
作者
Kianmehr, Ehsan [1 ]
Nikkhah, Saman [2 ]
Rabiee, Abbas [2 ]
机构
[1] Islamic Azad Univ, Doroud Branch, Dept Elect Engn, Doroud, Iran
[2] Univ Zanjan, Dept Elect Engn, Zanjan, Iran
关键词
Distributed generation (DG); Distribution system reconfiguration (DSR); Multi-objective stochastic optimization; Uncertainty; Pareto optimal solutions; DISTRIBUTION-SYSTEM RECONFIGURATION; DISTRIBUTION FEEDER RECONFIGURATION; DISTRIBUTED GENERATION ALLOCATION; PARTICLE SWARM OPTIMIZATION; POWER DISTRIBUTION; GENETIC ALGORITHM; VOLTAGE STABILITY; LOSS REDUCTION; LOAD; RELIABILITY;
D O I
10.1016/j.renene.2018.08.032
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Optimal distribution system reconfiguration (DSR) and distribution generation (DG) allocation are viable solutions for improvement of technical and economic aspects of distribution systems. This paper proposes a stochastic multi-objective DSR (SMO-DSR) model, aims to maximize the DG owner's profit and minimizes the distribution company's (DisCo's) costs. The uncertainties of wind power generation, electricity price, and demand are handled via scenario based approach. The proposed SMO-DSR model is solved via epsilon-constraint method and the best compromise solution is selected by fuzzy satisfying criterion. The model is a mixed integer non-linear programing (MINLP) problem which is implemented on IEEE 33 bus distribution system in General Algebraic Modeling System (GAMS) environment. To show the effectiveness of the proposed SMO-DSR approach, it is studied in different cases. A sensitivity analysis is also performed to show the effect of contract price of wind energy on the objectives of DisCo and DG owner. The obtained results substantiate the interaction between the DSR and DG allocation problems. Also, it is shown that the contract price of wind energy considerably influences both DG owner and DisCo schedules. Besides, when a compromise is made between the DG owner's profit and DisCo's cost, the power losses of the network is reduced. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:471 / 485
页数:15
相关论文
共 43 条
  • [41] Enhancing controller's tuning reliability with multi-objective optimisation: From Model in the loop to Hardware in the loop
    Carrau, Jesus Velasco
    Reynoso-Meza, Gilberto
    Garcia-Nieto, Sergio
    Blasco, Xavier
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2017, 64 : 52 - 66
  • [42] A Stochastic Multi-Objective Model for China's Provincial Generation-Mix Planning: Considering Variable Renewable and Transmission Capacity
    Zhou, Shuangshuang
    Yang, Juan
    Yu, Shiwei
    ENERGIES, 2022, 15 (08)
  • [43] Spatial-Temporal Variation and Driving Forces of Carbon Storage at the County Scale in China Based on a Gray Multi-Objective Optimization-Patch-Level Land Use Simulation-Integrated Valuation of Ecosystem Services and Tradeoffs-Optimal Parameter-Based Geographical Detector Model: Taking the Daiyun Mountain's Rim as an Example
    Chen, Gui
    Peng, Qingxia
    Fan, Qiaohong
    Lin, Wenxiong
    Su, Kai
    LAND, 2025, 14 (01)