A competent memetic algorithm for complex scheduling

被引:11
|
作者
Gonzalez, Miguel A. [1 ,2 ]
Vela, Camino R. [1 ,2 ]
Varela, Ramiro [1 ,2 ]
机构
[1] Univ Oviedo, AI Ctr, Oviedo, Spain
[2] Univ Oviedo, Dept Comp Sci, Oviedo, Spain
关键词
Memetic algorithms; Tabu search; Scheduling; Setup times; SHIFTING BOTTLENECK; SEARCH ALGORITHM; SHOP PROBLEM; SETUP TIMES;
D O I
10.1007/s11047-011-9300-y
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
We face the job shop scheduling problem with sequence dependent setup times and makespan minimization by memetic algorithm. This algorithm combines a classic genetic algorithm with a local searcher. The performance of the local searcher relies on the combination of a tabu search algorithm with a neighborhood structure termed N (S) that are thoroughly described and analyzed. Also, two evolution models are considered: Lamarckian and Baldwinian evolution. We report results from an experimental study across conventional benchmark instances showing that the proposed algorithm outperforms the current state-of-the-art methods and that Lamarckian evolution is better than Baldwinian evolution.
引用
收藏
页码:151 / 160
页数:10
相关论文
共 50 条
  • [31] Emergency Materials Scheduling in Disaster Relief Based on a Memetic Algorithm
    Qin, Yongwei
    Liu, Jing
    NEURAL INFORMATION PROCESSING (ICONIP 2017), PT IV, 2017, 10637 : 279 - 287
  • [32] A Memetic Algorithm for staff scheduling problem in airport security service
    Soukour, Anas Abdoul
    Devendeville, Laure
    Lucet, Corinne
    Moukrim, Aziz
    EXPERT SYSTEMS WITH APPLICATIONS, 2013, 40 (18) : 7504 - 7512
  • [33] Memetic algorithm for crane scheduling problem with spatial and temporal constraints
    Wang, Xu
    Liu, Shi-Xin
    Wang, Jia
    Dongbei Daxue Xuebao/Journal of Northeastern University, 2014, 35 (02): : 190 - 194
  • [34] Memetic algorithm for the resource-constrained project scheduling problem
    Chen, Di
    Liu, Shixin
    Qin, Shujin
    2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, : 4991 - 4996
  • [35] Multi-Project Scheduling Using a Heuristic and Memetic Algorithm
    Kumanan, S.
    Raja, K.
    JOURNAL FOR MANUFACTURING SCIENCE AND PRODUCTION, 2009, 10 (3-4) : 249 - 256
  • [36] Memetic algorithm for solving resource constrained project scheduling problems
    Rahman, Humyun Fuad
    Chakrabortty, Ripon K.
    Ryan, Michael J.
    AUTOMATION IN CONSTRUCTION, 2020, 111
  • [37] A Multi-Objective Memetic Algorithm for Workflow Scheduling in Clouds
    Yao, Feng
    Chen, Huangke
    Liu, Xiaolu
    Gong, Maoguo
    Xing, Lining
    Zhao, Wei
    Zheng, Long
    IEEE TRANSACTIONS ON EMERGING TOPICS IN COMPUTATIONAL INTELLIGENCE, 2024,
  • [38] Memetic Algorithm for solving Resource Constrained Project Scheduling Problems
    Ali, Ismail M.
    Elsayed, Saber M.
    Ray, Tapabrata
    Sarker, Ruhul A.
    2015 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2015, : 2761 - 2767
  • [39] A memetic algorithm for a home health care routing and scheduling problem
    Decerle, Jeremy
    Grunder, Olivier
    El Hassani, Amir Hajjam
    Barakat, Oussama
    OPERATIONS RESEARCH FOR HEALTH CARE, 2018, 16 : 59 - 71
  • [40] An Effective Memetic Algorithm for Resource Constrained Project Scheduling Problem
    Rahman, Humyun Fuad
    Chakrabortty, Ripon Kumar
    Ryan, Michael J.
    2019 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2019, : 2160 - 2166