Optimizing distributed no-wait flow shop scheduling problem with setup times and maintenance operations via iterated greedy algorithm

被引:25
|
作者
Miyata, Hugo Hissashi [1 ]
Nagano, Marcelo Seido [1 ]
机构
[1] Univ Sao Paulo, Sao Carlos Sch Engn, Prod Engn Dept, Av Trabalhador Sao Carlense 400, BR-13566590 Sao Carlos, SP, Brazil
关键词
Scheduling; Maintenance; Distributed no-wait flow shop; Makespan; PREVENTIVE MAINTENANCE; SEARCH ALGORITHM; HEURISTIC ALGORITHM; MAKESPAN; MACHINE; MINIMIZE; METAHEURISTICS; OPTIMIZATION; BLOCKING; PERFORMANCE;
D O I
10.1016/j.jmsy.2021.10.005
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Nowadays, distributed scheduling problem is a reality in many companies. Over the last years, an increasingly attention has been given to the distributed flow shop scheduling problem and the addition of constraints to the problem. This article introduces the distributed no-wait flow shop scheduling problem with sequence-dependent setup times and maintenance operations to minimize makespan. A mixed-integer linear programming (MILP) is to mathematically describe the problem and heuristic procedures to incorporate maintenance operations to job scheduling are proposed. An Iterated Greedy with Variable Search Neighborhood (VNS), named IG_NM, is proposed to solve small and large instances with size of 4,800 and 13,200 problems, respectively. Computational experiments were conducted to evaluate the performance of IG_NM in comparison with MILP and the most recent methods of literature of distributed flow shop scheduling problems. Statistical results show that in the trade-off between effectiveness and efficiency the proposed IG_NM outperformed other metaheuristics of the literature.
引用
收藏
页码:592 / 612
页数:21
相关论文
共 50 条
  • [21] An effective iterated local search algorithm for the distributed no-wait flowshop scheduling problem
    Avci, Mustafa
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2023, 120
  • [22] Improved iterated greedy algorithm for reentrant flow shop scheduling problem
    Wu, Xiuli
    Li, Yuxin
    Kuang, Yuan
    Cui, Jianjie
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2024, 30 (07): : 2364 - 2380
  • [23] A Quantum-PSO Algorithm for No-Wait Flow shop Scheduling Problem
    Chang, Junlin
    An, Fengshuan
    Su, Pizhao
    2010 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-5, 2010, : 179 - +
  • [24] A discrete whale optimization algorithm for the no-wait flow shop scheduling problem
    Zhang, Sujun
    Gu, Xingsheng
    MEASUREMENT & CONTROL, 2023, 56 (9-10): : 1764 - 1779
  • [25] An iterated greedy heuristic for no-wait flow shops with sequence dependent setup times, learning and forgetting effects
    Li, Xiaoping
    Yang, Zhi
    Ruiz, Ruben
    Chen, Tian
    Sui, Shaochun
    INFORMATION SCIENCES, 2018, 453 : 408 - 425
  • [26] Hybrid Estimation of Distribution Algorithm for No-Wait Flow-Shop Scheduling Problem with Sequence-Dependent Setup Times and Release Dates
    Zhang, Zi-Qi
    Qian, Bin
    Hu, Rong
    Zhang, Chang-Sheng
    Li, Zi-Hui
    INTELLIGENT COMPUTING THEORIES AND APPLICATION, ICIC 2016, PT I, 2016, 9771 : 505 - 516
  • [27] An evolutionary clustering search for the no-wait flow shop problem with sequence dependent setup times
    Nagano, Marcelo Seido
    da Silva, Augusto Almeida
    Nogueira Lorena, Luiz Antonio
    EXPERT SYSTEMS WITH APPLICATIONS, 2014, 41 (08) : 3628 - 3633
  • [28] Effective constructive heuristics for distributed no-wait flexible flow shop scheduling problem
    Shao, Weishi
    Shao, Zhongshi
    Pi, Dechang
    COMPUTERS & OPERATIONS RESEARCH, 2021, 136
  • [29] A genetic algorithm and particle swarm optimization for no-wait flow shop problem with separable setup times and makespan criterion
    Samarghandi, Hamed
    ElMekkawy, Tarek Y.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 61 (9-12): : 1101 - 1114
  • [30] A genetic algorithm and particle swarm optimization for no-wait flow shop problem with separable setup times and makespan criterion
    Hamed Samarghandi
    Tarek Y. ElMekkawy
    The International Journal of Advanced Manufacturing Technology, 2012, 61 : 1101 - 1114