A Framework for Selecting Construction Project Delivery Method Using Design Structure Matrix

被引:5
|
作者
Zhong, Qingping [1 ]
Tang, Hui [1 ]
Chen, Chuan [2 ]
机构
[1] Sichuan Univ, Inst Disaster Management & Reconstruct, Chengdu 610065, Peoples R China
[2] Sichuan Univ, Business Sch, Chengdu 610065, Peoples R China
基金
中国国家自然科学基金;
关键词
project delivery method; PDM; procurement selection; delivery selection; design structure matrix; DSM; DEPENDENCY STRUCTURE MATRIX; SYSTEM SELECTION; MODEL; DECOMPOSITION; UNCERTAINTY; STRENGTH; CHOICE;
D O I
10.3390/buildings12040443
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Determining a project delivery method that matches the characteristics of a construction project is a critical step that affects the success or failure of a project. The Project Delivery Method (PDM) should be adapted to the activities and processes of project implementation. However, the traditional selection method does not come from the internal process of the project which may lead to the delivery method not being able to meet the actual project requirements. This research proposes a DSM-based PDM selection framework model that regroups activities and identifies appropriate PDMs by revealing the dependencies and intensities between activities. The research uses a case to demonstrate the feasibility of the framework. After considering specific project requirements and goals, the framework model can be used as a basis for choosing specific project delivery methods, or as a visualization tool to help owners schedule activities.
引用
收藏
页数:20
相关论文
共 50 条
  • [41] Project-based configuration: An analysis with design structure matrix
    Sandhu, Maqsood
    PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON INNOVATION & MANAGEMENT, VOLS I AND II, 2007, : 1554 - 1560
  • [42] Schedule Model for Project Portfolio Based on Design Structure Matrix
    LI Sui-ke
    BAI Si-jun
    GUO Yu-tao
    International Journal of Plant Engineering and Management, 2013, 18 (01) : 50 - 57
  • [43] Sustainability-oriented Product Modular Design Using Design Structure Matrix (DSM) Method
    Yan, Jihong
    Feng, Chunhua
    MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION IV, PTS 1 AND 2, 2012, 128-129 : 1468 - 1471
  • [44] Risk-Based Project Delivery Selection Model for Highway Design and Construction
    Tran, Dai Q.
    Molenaar, Keith R.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2015, 141 (12)
  • [45] Using Digital Delivery to Streamline Lab Design and Construction
    Edwards, Matt
    Naviello, Vince
    Lab Manager, 2022, 17 (02): : 28 - 29
  • [46] Integrated project delivery (IPD) for maximizing design and construction considerations regarding sustainability
    Jones, Barry
    2ND INTERNATIONAL CONFERENCE ON SUSTAINABLE CIVIL ENGINEERING STRUCTURES AND CONSTRUCTION MATERIALS, 2014, 95 : 528 - 538
  • [47] Examination of communication processes in design-build project delivery in building construction
    Tran, Dai Q.
    Long Duy Nguyen
    Faught, Allen
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (06) : 1319 - 1336
  • [48] Multicriterion Decision-Support Model for Selecting the Appropriate Delivery Method in Sustainable Construction Projects
    Ahmed, Salma
    El-Sayegh, Sameh M.
    JOURNAL OF ARCHITECTURAL ENGINEERING, 2024, 30 (02)
  • [49] Perceptions towards risks involved in off-site construction in the integrated design & construction project delivery
    Wu, Ping
    Xu, Yidong
    Jin, Ruoyu
    Lu, Qingqing
    Madgwick, Della
    Hancock, Craig Matthew
    JOURNAL OF CLEANER PRODUCTION, 2019, 213 : 899 - 914
  • [50] Design communication using a variation of the design structure matrix
    Lockledge, JC
    Salustri, FA
    DESIGN MANAGEMENT - PROCESS AND INFORMATION ISSUES, 2001, : 27 - 34