Research on the influence mechanism of safety risk factors on traffic organization of high-speed railway construction

被引:2
|
作者
Shen, Zebin [1 ]
Zhang, Meijie [1 ]
Liu, Yiyang [1 ]
Jiang, Chunlin [2 ]
机构
[1] Beijing Jiaotong Univ, Sch Econ & Management, Beijing 100044, Peoples R China
[2] China Railway 3 Engn Grp Co Ltd, Taiyuan 030001, Shanxi, Peoples R China
关键词
D O I
10.1088/1755-1315/647/1/012174
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In the development of high-speed railway construction, the high-speed railway construction scheme and technology are constantly improved. Nowadays, the high-speed railway construction mainly relies on the traffic organization of the railway to organize the transportation of prefabricated components and carry out hoisting. In the process of traffic operation organization of railway engineering, the construction company often faces many safety risks. Therefore, it is of great significance to analyze the influence mechanism of various risk factors on the operation and safety of Railway Engineering and put forward corresponding suggestions. In this paper, through literature analysis and expert interviews, nine key factors are selected. The safety risk factors are divided from four dimensions of personnel, machinery, management and environment. The importance of these risk factors is ranked by AHP, and Through the method of interpretative structural model, this paper uses these nine key factors to build a five layer interpretative structural model, and uses interpretative structural model to analyze the influence mechanism of safety risk factors on driving organization safety.
引用
收藏
页数:5
相关论文
共 50 条
  • [21] Roles of owners' leadership in construction safety: The case of high-speed railway construction projects in China
    Wu, Chunlin
    Fang, Dongping
    Li, Nan
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2015, 33 (08) : 1665 - 1679
  • [23] Research on the Safety Influence of Subway Shield Method Crossing Existing High-speed Railway Frame Bridge
    Xia, Qunshan
    Journal of Railway Engineering Society, 2021, 38 (06) : 82 - 86
  • [24] New technologies for high-risk tunnel construction in GuiyangGuangzhou high-speed railway
    Yubao Zhao
    Shougen Chen
    Xinrong Tan
    Ma Hui
    Journal of Modern Transportation, 2013, 21 (04) : 258 - 265
  • [25] Modelling traffic action in high-speed railway bridges
    Pring, Bradley
    Ruiz-Teran, Ana M.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2020, 173 (03) : 123 - 142
  • [26] Information management model of construction schedule risk of high-speed railway project
    Liu, Weiqing
    Chen, Tingru
    Wei, Wanbing
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 426 - 430
  • [27] Research on the swelling mechanism of high-speed railway subgrade and the induced railway heave of ballastless tracks
    Wang, Rui
    Cheng, Jian-jun
    Gao, Li
    Li, Zhong-guo
    Qi, Yan-lu
    Wang, Meng-tian
    Ding, Bo-song
    TRANSPORTATION GEOTECHNICS, 2021, 27
  • [28] Electromagnetic Environment Assessment and Safety Research of Electrified High-Speed Railway Carriages
    Shi, Lei
    Liang, Junyi
    Liu, Yazhi
    Zhao, Yuanyuan
    Li, Xinran
    ELECTRONICS, 2024, 13 (04)
  • [29] Research on safety evaluation of GSM-R communication of high-speed railway
    Wang, J.-J. (123456wangjuan@163.com), 1600, Science Press (34):
  • [30] Influence of load distribution on the dynamic response of railway bridges under high-speed traffic
    Bettinelli, L.
    Stollwitzer, A.
    Fink, J.
    BAUINGENIEUR, 2021, 96 (09): : 285 - 295