CAD_ ADVANCED PROJECT MANAGEMENT

被引:0
|
作者
Ruiz Castrillo, Maria Isabel [1 ]
机构
[1] UPC, Dept Expres Graf Arquitecton 1, Barcelona, Spain
关键词
work; learning cooperative;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This optional subject belongs to the fourth year of the 2010 plan. It has been created with the aim to enhance and develop student's working group ability in complex architectural projects. In order to do so, we consider necessary to create cooperative participation environment. Students would work in teams to exchange and verify raw provided material. Based on it, team should discuss planning, management and development to eventually present the architectural complex and its surroundings. Therefore, this experience is focused on three topics: advanced management of a complex project, collaborative work in a digital environment and solution presentation. Development of Torre Valentina, 1959, from Jose Antonio Coderch, has been chosen as proposed project. It has been never build. Full model is expected as output of this experience, emulating the known model from the photographs presented by Coderch at CIAM -10.
引用
收藏
页码:126 / 138
页数:13
相关论文
共 50 条
  • [41] Project Uncertainty Management and Project Management Simulation
    Cheng Lili
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 2069 - 2072
  • [43] ADVANCED CAD TOOLS FOR ASIC TESTING
    LIU, DL
    VLSI AND COMPUTER PERIPHERALS: VLSI AND MICROELECTRONIC APPLICATIONS IN INTELLIGENT PERIPHERALS AND THEIR INTERCONNECTION NETWORKS, 1989, : E15 - E19
  • [44] Strategies to optimize CAD prevention in modern cardiology - The "Marburg CAD Prevention Project"
    Schaefer, JR
    Simon, B
    Soufi, M
    Sattler, A
    Noll, B
    Herzum, M
    Maisch, B
    HERZ, 2000, 25 (02) : 113 - 116
  • [46] THE ADVANCED PRACTICUM PROJECT
    RODGERS, BL
    COWLES, KV
    NURSING OUTLOOK, 1990, 38 (01) : 31 - 35
  • [47] ADVANCED PROJECT CONTROL
    JOHNSON, JR
    JOURNAL OF SYSTEMS MANAGEMENT, 1977, 28 (05): : 24 - 27
  • [48] THE ADVANCED ARCHITECTURES PROJECT
    RICE, J
    AI MAGAZINE, 1989, 10 (04) : 27 - 39
  • [49] CAD SYSTEM USED FOR MAJOR OFFSHORE PROJECT
    BARTON, JC
    FINLEY, CR
    FAULKNER, JR
    OIL & GAS JOURNAL, 1986, 84 (09) : 96 - +
  • [50] Study on project-oriented CAD software
    Liang, Likai
    2000, Fushun Petrol Inst, Fushun Liaoning, China (20):