Linear Optimization Model to Minimize Total Cost of Repetitive Construction Projects and Identify Order of Units

被引:25
|
作者
Monghasemi, Shahryar [1 ]
Abdallah, Moatassem [1 ]
机构
[1] Univ Colorado Denver, Dept Civil Engn, 1200 Larimer, Denver, CO 80204 USA
关键词
Repetitive construction projects; Linear scheduling; Optimization; Construction planning and scheduling; Linear programing; Resource driven scheduling; SCHEDULING METHOD; PATH; LOB;
D O I
10.1061/(ASCE)ME.1943-5479.0000936
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study developed a linear optimization model for scheduling repetitive construction projects with varying quantities of work in repetitive units. The model provides new capabilities that enable planners to identify an optimal/near-optimal schedule that minimizes project total cost and number of times crew work is interrupted. It is capable of identifying the optimal/near-optimal order of executing repetitive units to achieve further reduction in project time and cost. The model was developed in three main phases: (1) identifying input data such as quantities and crew productivity rates; (2) optimizing the construction schedule of repetitive units by identifying decision variables, formulating objective functions, and constraints, and executing model computations; and (3) visualizing the generated optimal/near-optimal schedule, crew interruption, project duration and cost, and order of executing repetitive units. Two case studies of 105 and 6 repetitive units were analyzed to evaluate the model performance. The model resulted in 0.13% and 4.2% additional reduction in project total cost and indirect cost, respectively, for the optimal order of repetitive units compared with the best model in the literature. (C) 2021 American Society of Civil Engineers.
引用
收藏
页数:15
相关论文
共 50 条
  • [21] A Hybrid Machine Learning and Optimization Model to Minimize the Total Cost of BRT Brake Components
    Najafi-Zangeneh, Saeed
    Gharneh, Naser Shams
    Arjomandi-Nezhad, Ali
    Hassannayebi, Erfan
    JOURNAL OF ADVANCED TRANSPORTATION, 2021, 2021
  • [22] A risk-cost optimization model for selecting human resources in construction projects
    Hamidreza Abbasianjahromi
    Soheil Hosseini
    SN Applied Sciences, 2019, 1
  • [23] A risk-cost optimization model for selecting human resources in construction projects
    Abbasianjahromi, Hamidreza
    Hosseini, Soheil
    SN APPLIED SCIENCES, 2019, 1 (11):
  • [24] Scheduling optimization model for linear projects with resource transfer in diverse construction scenarios
    Zhao, Xuan
    Zhou, Guohua
    ENGINEERING OPTIMIZATION, 2024,
  • [25] GA optimization model for repetitive projects with soft logic
    Fan, Su-Ling
    Sun, Kuo-Shun
    Wang, Yu-Ren
    AUTOMATION IN CONSTRUCTION, 2012, 21 : 253 - 261
  • [26] Optimum number of units to minimize the construction cost of multi-story buildings
    Alver, G
    Biçer, Ü
    XXX IAHS WORLD CONGRESS ON HOUSING, HOUSING CONSTRUCTION: AN INTERDISCIPLINARY TASK, VOLS 1-3, 2002, : 245 - 249
  • [27] Quality cost management model for construction projects
    Dolacek-Alduk, Zlata
    Radujkovic, Mladen
    Mikulic, Dunja
    GRADEVINAR, 2009, 61 (02): : 147 - 156
  • [28] Model of Predicting Cost Overrun in Construction Projects
    Plebankiewicz, Edyta
    SUSTAINABILITY, 2018, 10 (12)
  • [29] A TRADE-OFF BETWEEN TIME AND COST IN SCHEDULING REPETITIVE CONSTRUCTION PROJECTS
    Zhang, Lihui
    Zou, Xin
    Qi, Jianxun
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2015, 11 (04) : 1423 - 1434
  • [30] Resource-Constrained Time-Cost Tradeoff for Repetitive Construction Projects
    Heravi, Gholamreza
    Moridi, Saeed
    KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (08) : 3265 - 3274