Parameter Optimization of Composite Basket Handle Tied Arch Bridge with Super width and Long Span

被引:0
|
作者
Chen Jingwei [1 ]
机构
[1] China Railway Shanghai Design Inst Grp Co Ltd, Shanghai 200070, Peoples R China
关键词
composite Basket Handle Tied Arch Bridge; Boom Force; Arch Section; Rise-Span Ratio; Optimization;
D O I
10.1109/ICICTA.2014.106
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Referring to the engineering practice, this paper optimizes the key design parameters of composite basket handle tied arch bridge with super width and long span. The boom force proportion of main and auxiliary arch is optimized according to the principle that the positive moments equal the negative moments of beams. The section dimension is optimized according to the optimization object that the force-resistance ratio is 1 of main and auxiliary arch section through amplification factor of section. The reasonable rise-span of rib can be got by researching the regular that stress, displacement and stability factor of main and auxiliary arch changes with the different rise by adjusting the rise of rib while keeping other parameters the same. The research of this paper provides a reference for related design and study.
引用
收藏
页码:414 / 417
页数:4
相关论文
共 50 条
  • [41] Investigation of aerostatic drag forces on rectangular arch ribs of long span arch bridge
    Zheng, Shi-Xiong, 1600, Wuhan Bridge Research Institute (44):
  • [42] Calculation method of eccentricity increase coefficient of arch rib of long⁃span arch bridge
    Guo F.
    Li P.-F.
    Mao J.-Y.
    Dong Y.-Z.
    Jilin Daxue Xuebao (Gongxueban)/Journal of Jilin University (Engineering and Technology Edition), 2022, 52 (06): : 1404 - 1412
  • [43] Super-long-span bridge with cable-stayed bridge and suspension bridge
    Wang, HJ
    Shioi, Y
    Hasegawa, A
    STRUCTURAL ENGINEERING AND MECHANICS, VOLS 1 AND 2, 1999, : 1589 - 1594
  • [44] Dynamic Response of a Long-Span Concrete-Filled Steel Tube Tied Arch Bridge and the Riding Comfort of Monorail Trains
    Gou, Hongye
    Zhou, Wen
    Yang, Changwei
    Bao, Yi
    Pu, Qianhui
    APPLIED SCIENCES-BASEL, 2018, 8 (04):
  • [45] Arch First and Beam Later: Arch-Rib Integral Installation Construction Technology for Large-Span Tied-Arch Bridge
    Xie, Wenxiang
    Zhao, Tingsheng
    Tang, Jingjing
    Zhang, Yong
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (08)
  • [46] Improvement in the Seismic Performance of a Super-Long-Span Concrete-Filled Steel-Tube-Arch Bridge
    Ye, Dan
    Tong, Yijin
    Gan, Lijun
    Tang, Zhuoran
    Zhang, Ruijie
    BUILDINGS, 2023, 13 (07)
  • [47] Analysis of suspension cable force of large-span steel tube concrete tied arch bridge
    Wang X.
    Wang X.
    Liang X.
    Zhou M.
    Du Y.
    Zhendong yu Chongji/Journal of Vibration and Shock, 2023, 42 (17): : 306 - 313
  • [48] Fundamental research of the possibility of super long span suspension bridge
    Fumoto, Koichiro
    Hata, Kensaku
    Kusuhara, Shigeki
    Doboku Gakkai Ronbunshuu A, 2007, 63 (01) : 220 - 231
  • [49] Constructional scheme comparison of a five-span tied rigid-frame CFST arch bridge
    Geng, Yue
    Wang, Yu-Yin
    Harbin Gongye Daxue Xuebao/Journal of Harbin Institute of Technology, 2007, 39 (SUPPL. 2): : 655 - 658
  • [50] Longitudinal Force Distribution of CWR on Long-span Arch Bridge
    Yan B.
    Fu H.
    Yu L.
    Wang W.
    Tiedao Xuebao/Journal of the China Railway Society, 2023, 45 (03): : 9 - 15