A new approximation algorithm for UET-scheduling with chain-type precedence constraints

被引:3
|
作者
Han, JY [1 ]
Wen, JJ
Zhang, GC
机构
[1] Chinese Acad Sci, Inst Appl Math, Beijing 100080, Peoples R China
[2] Graz Tech Univ, Inst Math, A-8010 Graz, Austria
关键词
precedence constraints; parallel machines; makespan; approximation algorithm;
D O I
10.1016/S0305-0548(98)00022-7
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper a new approximation algorithm with worst case performance ratio 3/2 is presented for the problem of scheduling unit execution time jobs on two parallel machines with the objective of minimizing the makespan where each job can be processed on only one machine and there are chain-type precedence constraints in the jobs. This result answers an open problem in Jansen et al. [Jansen, K., Woeginger, G. J. and Yu, Z., UET-Scheduling with chain-type precedence constraints. Report 277, Technische Universitat Graz, Institut fur Mathematik, Graz, Austria, 1993.]: "Does there exist a polynomial time heuristic with worst-case guarantee better than 5/3 for the problem U2Chain?". The new approximation algorithm is also applied to the problem J2\pmtn\C-max. (C) 1998 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:767 / 771
页数:5
相关论文
共 50 条
  • [31] Workflow balancing in parallel machine scheduling with precedence constraints using genetic algorithm
    Rajakumar, S.
    Arunachalam, V. P.
    Selladurai, V.
    JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT, 2006, 17 (02) : 239 - 254
  • [32] A hybrid genetic algorithm for integrated process planning and scheduling problem with precedence constraints
    M. R. Amin-Naseri
    Ahmad J. Afshari
    The International Journal of Advanced Manufacturing Technology, 2012, 59 : 273 - 287
  • [33] Dynamic scheduling algorithm for hybrid real-time tasks with precedence constraints
    Yin, Jin-Yong
    Gu, Guo-Chang
    Zhao, Jing
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (02): : 411 - 416
  • [34] A Tabu-search Algorithm for Scheduling Jobs with Precedence Constraints on Parallel Machines
    Xu, Kailiang
    Fei, Rong
    He, Dahai
    PROCEEDINGS OF THE 2018 13TH IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS (ICIEA 2018), 2018, : 2774 - 2781
  • [35] Two-machine flow shop scheduling with deteriorating jobs and chain precedence constraints
    Zhao, Chuanli
    Tang, Hengyong
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 136 (01) : 131 - 136
  • [36] A Review of Chain-Type Estimators and a New Chain-Type Multivariate Regression Approach for Population Mean Under Two-Occasion Successive Sampling
    Housila P. Singh
    Surya K. Pal
    Proceedings of the National Academy of Sciences, India Section A: Physical Sciences, 2017, 87 : 31 - 56
  • [37] Approximation Algorithm for Scheduling a Chain of Tasks on Heterogeneous Systems
    Aba, Massinissa Ait
    Zaourar, Lilia
    Munier, Alix
    EURO-PAR 2017: PARALLEL PROCESSING WORKSHOPS, 2018, 10659 : 353 - 365
  • [38] A Metaheuristic Algorithm to Transporter Scheduling for Assembly Blocks in a Shipyard considering Precedence and Cooperating Constraints
    Tao, Ning-Rong
    Jiang, Zu-Hua
    Liu, Jian-Feng
    Xia, Bei-Xin
    Li, Bai-He
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2019, 2019
  • [39] Advanced process planning and scheduling with precedence constraints and machine selection using a genetic algorithm
    Moon, C
    Lee, YH
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2003, 10 (01): : 26 - 34
  • [40] Parallel robot scheduling to minimize mean tardiness with precedence constraints using a genetic algorithm
    Cakar, Tarik
    Koeker, Rasit
    Demir, H. Ibrahim
    ADVANCES IN ENGINEERING SOFTWARE, 2008, 39 (01) : 47 - 54