共 50 条
- [31] Method for determining the load on and width of coal pillar at the recovery room end of fully-mechanized longwall mining Zhongguo Kuangye Daxue Xuebao/Journal of China University of Mining and Technology, 2015, 44 (06): : 990 - 995
- [32] Research on equipment intelligent control system in large mining height fully-mechanized face Meitan Kexue Jishu/Coal Science and Technology (Peking), 2022, 50 (09): : 192 - 199
- [33] A Q-GERT network model for the optimization of mining process of the fully-mechanized face MINE PLANNING AND EQUIPMENT SECTION 1997, 1997, : 713 - 716
- [34] Design of flexible track and kinematics simulation of inspection robot in fully-mechanized mining face Meitan Kexue Jishu/Coal Science and Technology (Peking), 2022, 50 (12): : 240 - 246
- [35] Coal gangue identification technology and its application in fully-mechanized coal mining face Yi Qi Yi Biao Xue Bao/Chinese Journal of Scientific Instrument, 2024, 45 (01): : 1 - 15
- [36] Moving mechanism and active control method of scraper conveyor in fully-mechanized mining face Meitan Kexue Jishu/Coal Science and Technology (Peking), 2024, 52 (10): : 189 - 198
- [38] Study on fully-mechanized top coal caving mining under water body with shallow overburden and thin bedrock RESOURCES AND SUSTAINABLE DEVELOPMENT, PTS 1-4, 2013, 734-737 : 644 - 649
- [39] Study on the fully mechanized longwall face working condition in China colliery MINE PLANNING AND EQUIPMENT SECTION 1997, 1997, : 243 - 248