Application of multi-stage scheduling

被引:0
|
作者
Bongers, Peter M. M. [1 ]
Bakker, B. H. [1 ]
机构
[1] Unilever Food & Hlth Res Inst, NL-3133 AT Vlaardingen, Netherlands
关键词
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
A simplified food factory model has been derived from a medium size ice cream manufacturing plant. This is done by building a multi-stage scheduling model which describes the infra-structure of the factory, which products are being produced and how the plant is operated. Key has been to translate complexity of the plant (and the operations) into a simplified, but realistic, multi-stage scheduling model. This model has been implemented in commercial available software. The production schedule could not be derived automatically, but needed manual intervention. Scheduling the factory as a whole, the available overall capacity of the factory can be increased significantly. The integrated factory schedule squeezes 10-30% additional capacity out of the factory.
引用
收藏
页码:1917 / 1922
页数:6
相关论文
共 50 条
  • [41] Solving Scheduling Problems in a Multi-stage Multiproduct Batch Pharmaceutical Industry
    Kopanos, Georgios M.
    Mendez, Carlos A.
    Puigjaner, Luis
    PRES 2010: 13TH INTERNATIONAL CONFERENCE ON PROCESS INTEGRATION, MODELLING AND OPTIMISATION FOR ENERGY SAVING AND POLLUTION REDUCTION, 2010, 21 : 511 - 516
  • [42] A Multi-Stage Dispatching and Scheduling Algorithm for Individualized Public Transportation System
    Yang, Zhenming
    Wang, Xuetao
    Li, Chenghao
    Zhao, Qianchuan
    2019 IEEE 15TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2019, : 745 - 750
  • [43] Scheduling a multi-stage fabrication shop for efficient subsequent assembly operations
    Lagodimos, AG
    Mihiotis, AN
    Kosmidis, VC
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2004, 90 (03) : 345 - 359
  • [44] Method for multi-stage alternative grouping parallel machines scheduling problem
    Miao, Feng
    Xie, An-Huan
    Wang, Fu-An
    Yu, Feng
    Zhou, Hua
    Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2015, 49 (05): : 866 - 872
  • [45] Multi-stage dynamic reentrant hybrid flowshop scheduling with transportation consideration
    Xuan H.
    Li B.
    Wang X.-Y.
    Xu C.-Q.
    Kongzhi Lilun Yu Yingyong/Control Theory and Applications, 2018, 35 (03): : 357 - 366
  • [46] Solution strategies for multi-stage wafer probing scheduling problem with reentry
    Pearn, W. L.
    Chung, S. H.
    Yang, M. H.
    Shiao, K. P.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2008, 59 (05) : 637 - 651
  • [47] MULTI-STAGE FLASH-EVAPORATION AND ITS APPLICATION
    KERTESZ, A
    MAGYAR KEMIKUSOK LAPJA, 1966, 21 (07): : 368 - &
  • [48] Scheduling for multi-stage applications with scalable virtual resources in cloud computing
    Jie Zhu
    Xiaoping Li
    International Journal of Machine Learning and Cybernetics, 2017, 8 : 1633 - 1641
  • [49] Open-Loop-Feedback Scheduling for Multi-Stage Production Systems
    Villa, Agostino
    Taurino, Teresa
    9TH CIRP CONFERENCE ON INTELLIGENT COMPUTATION IN MANUFACTURING ENGINEERING - CIRP ICME '14, 2015, 33 : 99 - 104
  • [50] Scheduling Stochastic Multi-Stage Jobs to Elastic Hybrid Cloud Resources
    Zhu, Jie
    Li, Xiaoping
    Ruiz, Ruben
    Xu, Xiaolong
    IEEE TRANSACTIONS ON PARALLEL AND DISTRIBUTED SYSTEMS, 2018, 29 (06) : 1401 - 1415