Rapid development of CFST arch bridges in China

被引:0
|
作者
Zhou, SX [1 ]
Chen, SL [1 ]
机构
[1] Chongqing Univ, Chongqing 630044, Peoples R China
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Since 1990, about 200 CFST arch bridges have been built all over China. The developing history of CFST arch bridges is divided into two distinctive stages according to the structural evolution in this paper. The advantages and disadvantages of design and construction were introduced separately in the different stages. The design defects and construction problems of CFST arch bridges, such as inappropriately pumped concrete causing weak bond between the steel tube wall and the filling concrete, the lack of effective post-grouting measures, the dangerous stress fatigue in the CFST arch ribs and short suspenders caused by repeated service loads, are stressed. The three typical CFST arch bridges are introduced in this paper.
引用
收藏
页码:915 / 920
页数:6
相关论文
共 50 条
  • [41] Seismic vulnerability analysis of long-span CFST stiff-skeleton concrete arch bridges
    Wang Z.
    Zhao R.
    Wu X.
    Zhao C.
    Zhendong yu Chongji/Journal of Vibration and Shock, 2023, 42 (16): : 72 - 81
  • [42] Mechanical response of long-span CFST arch bridges based on the hydration heat temperature effect
    Wu, Yuexing
    Wen, Qiang
    Dai, Meihong
    Wang, Xinzhong
    Li, Xingxin
    Tan, Xianliang
    SCIENTIFIC REPORTS, 2024, 14 (01):
  • [43] Nonlinear analysis of steel tube initial stress effect in stell tube on bearing capacity for CFST arch bridges
    Zhou, Shui-Xing
    Zhang, Min
    Wang, Xiao-Song
    Jisuan Lixue Xuebao/Chinese Journal of Computational Mechanics, 2010, 27 (02): : 291 - 297
  • [44] Tests of vacuum-aided casting of concrete in tubes of a CFST arch bridge and application of the casting to actual bridges
    Chongqing Jiaotong University, Chongqing
    400074, China
    不详
    530001, China
    Bridge Constr., 2 (19-25):
  • [45] Review of construction and technology development of arch bridges in the world
    Chen B.-C.
    Liu J.-P.
    Jiaotong Yunshu Gongcheng Xuebao/Journal of Traffic and Transportation Engineering, 2020, 20 (01): : 27 - 41
  • [46] Foundation design of single-span arch bridges in China
    Zhang, Zhitong
    Leong, Eng Choon
    Gong, Weiming
    Dai, Guoliang
    Li, Jian
    CASE STUDIES IN CONSTRUCTION MATERIALS, 2023, 19
  • [47] 1700046 China's unique woven timber arch bridges
    Zhou, Haifei
    Leng, Jiawei
    Zhou, Man
    Chun, Qing
    Hassanein, Mostafa Fahmi
    Zhong, Wenzhou
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2019, 172 (01) : 15 - 15
  • [48] Application of concrete filled steel tubular arch bridges in China
    Wang, Y. Y.
    Wu, X. R.
    Geng, Y.
    Zhang, S. M.
    TUBULAR STRUCTURES XIV, 2012, : 465 - 472
  • [49] Concrete-Filled Steel Tube Arch Bridges in China
    Zheng, Jielian
    Wang, Jianjun
    ENGINEERING, 2018, 4 (01) : 143 - 155
  • [50] Construction of concrete filled steel tube arch bridges in China
    Central Laboratory of Engineering Structures and Materials, Southeast University, China
    不详
    不详
    Indian Concr J, 2007, 11 (41-47):