Application of the value-based approach to the planning of customer delivery systems

被引:0
|
作者
Abu-El-Magd, MA [1 ]
Hamoud, GA [1 ]
Findlay, RD [1 ]
机构
[1] McMaster Univ, Dept Elect & Comp Engn, Hamilton, ON, Canada
关键词
customer delivery system planning; capital cost; customer interruption cost; load forecast uncertainty; reserve margin and value-based reliability assessment;
D O I
10.1109/PES.2003.1270441
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Customer delivery systems have been planned to deterministic criteria for a long time. With these criteria, new capacity is determined when the system load is just equal to the system limited time rating. Even, some electrical utilities in North America allow for some positive reserve margin in order to cover for load forecast uncertainty. These deterministic criteria do not quantify the reliability of the system and in many situations, can result in over-designed systems and therefore, the electricity users can end up paying higher prices for electricity. In a competitive electricity market, transmission system owners or providers should try to keep the cost of upgrading, operating and maintaining their systems as low as possible while meeting the expectations of their customers and regulatory rules. This paper describes the application of a value-based approach to the planning of customer delivery systems. In this application, the reliability of the system is expressed as a function of the reserve margin and the optimal reserve level is obtained when the total system cost is minimal. Sensitivity studies are carried out to determine the impact of changes in some key parameters on the optimal reserve margin. An example is presented to illustrate the concepts involved.
引用
收藏
页码:968 / 973
页数:6
相关论文
共 50 条
  • [31] Could Value-Based Purchasing Approach Be Used in Assessment of Healthcare Delivery Outputs?
    Simsir, Ismail
    Altindis, Selma
    KONURALP TIP DERGISI, 2019, 11 (03): : 475 - 481
  • [32] ALIGNING BUSINESS PLANNING TO VALUE-BASED MANAGEMENT
    Britzelmaier, Bernd
    Huss, Christoph
    EUROPEAN AND MEDITERRANEAN TRENDS AND CHALLENGES IN THE 21ST CENTURY, 2008, : 135 - 146
  • [33] Support for integrated value-based maintenance planning
    Kunz, JC
    Jin, Y
    Levitt, RE
    Lin, SD
    Teicholz, PM
    IEEE EXPERT-INTELLIGENT SYSTEMS & THEIR APPLICATIONS, 1996, 11 (04): : 35 - 44
  • [34] Value-based distribution system reliability planning
    Koval, DO
    Chowdhury, AA
    IAS '96 - CONFERENCE RECORD OF THE 1996 IEEE INDUSTRY APPLICATIONS CONFERENCE, THIRTY-FIRST IAS ANNUAL MEETING, VOLS 1-4, 1996, : 2359 - 2365
  • [35] Value-based reliability transmission planning - Response
    Dalton, JG
    Garrison, DL
    Fallon, CM
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (03) : 1408 - 1408
  • [36] Value-based power system reliability planning
    Chowdhury, AA
    Koval, DO
    1998 IEEE INDUSTRIAL & COMMERCIAL POWER SYSTEMS TECHNICAL CONFERENCE - CONFERENCE RECORD, 1998, : 1 - 7
  • [37] VALUE-BASED DISTRIBUTION RELIABILITY ASSESSMENT AND PLANNING
    CHEN, RL
    ALLEN, K
    BILLINTON, R
    IEEE TRANSACTIONS ON POWER DELIVERY, 1995, 10 (01) : 421 - 429
  • [38] Value-based distribution system reliability planning
    Chowdhury, AA
    Koval, DO
    IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 1998, 34 (01) : 23 - 29
  • [39] THE USE OF PROBABILITY TECHNIQUES IN VALUE-BASED PLANNING
    RAU, NS
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1994, 9 (04) : 2001 - 2013
  • [40] Value-based power system reliability planning
    Chowdhury, AA
    Koval, DO
    IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 1999, 35 (02) : 305 - 311